1. DESIGNING, TECHNICAL CONTROL OF THE DESIGN DOCUMENTATION, SUPERVISION, ENGINEERING SERVICES ON PROVIDING REQUIRED APPROVALS AND PERMITS
Facility / Project title |
Activities/Project type |
Year |
Investor / Client |
Contract No. |
---|---|---|---|---|
Study with proposed activities to increase the operational efficiency of storage and handling of LPG products |
Elaboration of the design/technical documentation |
In progres |
NIS a.d. |
NM_051600/UD-RA/009279 28.09.2020. |
Harmonization of measuring points for measuring emissions of air pollutants at emitters in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
DWN105000/UD-RA/00650 22.01.2020 |
Furnace protection in case of gas leakage at plants in Oil Refinery Pančevo |
Elaboration of the design/technical documentation |
In progres |
NIS a.d. |
NM_051600/UD-RA/01748 18.02.2020. |
Facility for temporary storage of waste in Zrenjanin |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
NFS780000/UD-RA/00280 04.02.2020. |
Replacement of 6kV power cables for power supply of TS Estara / TS Enova |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
DWN115000/UD-RA/02773 06.04.2020 |
Replacement of 0.4 kV plant type T12 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN115000/UD-RA/02773 12.03.2020 |
Integration of PLC 0.4 kV distribution plants (SWG) in Elektro DCS in RNP |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN115000/UD-RA/09566 13.09.2019 |
Increasing the diameter of the overflow pipe FA-1000 towards a closed drainage system in the RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-1 03.02.2020. |
Dosing of steam neutralizer on S-100 in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-2 03.02.2020. |
Reconstruction of pipeline 12 "-P-43-0040-07-01-B01G00A" in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-3 03.02.2020. |
Connection of circulation lines of tanks FB-25301 and FB-25304 in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-4 03.02.2020. |
Construction of a storage pool of mud (unit 10) in Novo Miloševo |
Elaboration of the design/technical documentation |
2019 |
NIS a.d. |
NFS900000/UD-RA/06054 31.05.2019 |
Terminal for the storage of oil derivatives - Sremski Karlovci |
Development of an environmental impact assessment Study |
2019 |
Eling Plan d.o.o. |
2554 of 23.10.2018. |
Substations : Jermenovci (10/0,4 kV, 160 kVA), Janošik (10/0,4 kV, 60 kVA), Sirakovo (400 kVA), Kikinda (400 kVA), Kikinda (630 kVA), Kikinda (160 kVA), Mokrin (sever 50 kVA) (west 50 kVA), Turija (250 kVA), Turija (400 kVA), |
Elaboration of the simplified mining design for the reconstruction |
2019 |
NIS a.d. |
UPS300000/UD-RA/13893 of 15.11.2018. |
ASTUP unit SLP in Oil Refinery Brod, Bosnia and Herzegovina |
Elaboration of the design for the modernization |
2019 |
SCAN Projkt d.o.o. Zagreb, HR |
35/18 of 24.09.2018. |
Replacement of the burners on process heaters BA-2101 and BA-2301 |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
Turbomehanika / NIS a.d. |
P2599 of 30.08.2018. |
Expertise of the causes for the collapse of the canopy on SSG Novi Sad |
Elaboration of the expertise |
2018 |
NIS a.d. |
PR0650000/UD-RA/09928 Of 17.08.2018. |
Reconstruction and construction of the oil derivatives storages SND Novi Sad, SND Niš and SND Smederevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2019 |
NIS a.d. |
NM_041000/UD-RA/12769 of 22.10.2018. |
Oil field Velebit - Kanjiža |
Elaboration of the design/technical and preparation of the Study on the performed measurements by the LRUT method |
2018 |
NIS a.d. |
UPS300000/UD-RA/08144 Of 03.07.2018. |
Oil Refinery - Šid |
Elaboration of control calculations of process equipment |
2018 |
Victorija Oil |
4500038723 |
Design of the tanks drainage system |
Elaboration of the design / technical documentation for the drainage of 45 tanks into the existing system of oily process waters |
2018 |
Oil Refinery Brod |
181K/18 Of 30.05.2018. |
Construction of the basin for the storage of drilling muds (8 and 9 cartidges) in Novo Miloševo |
Elaboration of the Detail Design |
2018 |
NIS a.d. |
OFS280000/UD-RA/06614 Of 28.05.2018. |
Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
NIS a.d. |
9500086831 Of 25.04.2018. |
Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
SIEMENS / NIS a.d. |
9500086831 Of 25.04.2018. |
Installation of the louvres on the channels after the FAN ½ for air regulation on the superheaters to the heater BA-2101 |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
NM_051600/UD-RA/07417 of 13.06.2018. |
Installation of the ventilators on the cooling tower |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
UPS300000/UD-RA/5538 Of 03.05.2018. |
Repair of the storage supports in PITING Unit in Elemir |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
UPS300000/UD-RA/5538 Of 03.05.2018. |
Development of refinery processing in Oil Refinery Pančevo – Construction of new units |
Technical review of the plant, devices, equipment and executed works |
2018 |
NIS a.d. |
NM_080000/UD-RA/05818 Of 09.05.2018. |
Repair of the piping between the lower MGO and upper MGO zone of the petrol storage Ledinci |
Elaboration of the technical-economical analysis and design/technical documentation |
2018 |
Transnafta a.d. |
1980/1-2018 of 02.03.2018. |
Design for site arrangment for the accomodation of the contractors |
Elaboration of the detail design |
2018 |
NIS a.d. |
PRE390000/UD-RA/01476 of 31.1.2018. |
Design for the replacement of the low-alloy piping S-2200 |
Elaboration of the detail design and checking of the technical documentation by the Notified Body |
2018 |
NIS a.d. |
PRE390000/UD-RA/15047 of 21.12.2018. |
Adaptation of the laboratory on NGP Velebit |
Elaboration of the simplified mining design |
2018 |
NIS a.d. |
UPS300000/UD-RA/03304 Of 14.03.2018. |
Installation of the blind valves on the storage tanks in manipulation |
Elaboration of the Detail Design |
2017 |
NIS a.d. |
PRE 390000/UD-RA/12373 OF 25.10.2017 |
Detail design based on the assessment of the condition of the equipment, concrete and steel structures, oil sewage and piping on S-2550 LPG Merox |
Elaboration of the Detail Design |
2018 |
CB&I/NIS a.d. |
172784-SC-EN-001.01 of 30.10.2017. |
Feasibility Study for the reconstruction of the laboratory building with variant conceptual solution for the reconstruction of the unit for NIS Rafinery Pančevo |
Elaboration of the Feasibility Stydy and Conceptual Solution |
2018 |
NIS a.d. |
NM_051600/UD-RA/14215 of 04.12.2017. |
Replacement of 6 kV supply cable for Substation TS N2 |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
NM_041000/IZ-DO/011914 of 16.08.2017. |
Adaptation of the pigging point on the oil pipeline Elemir – Novi Sad |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
UPS330000/UD-RA/08169 of 12.07.2017. |
Design of reservoir for H2SO4 storage in Power unit Pančevo |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
NM_041000/IZ-DO/08483 of 05.06.2017. |
Refurbishment of fire protection coating on steel construction at VRU at oil station and supporting columns of reservoirs |
Elaboration of design documentation |
2017 |
NIS a.d. |
PRE390000/UD-RA/04637 of 18.04.2017. |
Design of electrical installation of drilling rigs |
Elaboration of design documentation (electro-energetic installations, installation of measurement and regulation, and Explosion Protection Document ) |
2017 |
Naftagas – Oilfield Services |
NFS720000/UD-RA/00309 of 20.04.2017. |
Rehabilitation of interconnection between secondary reformer 103-D and boiler 101-C at NH3 plant III |
Elaboration of design for construction |
2017 |
HIP Azotara -Ammonia Plant Pančevo |
2484 |
Construction of a canopy for oils and lubricants and construction of a canopy for spare part |
Elaboration of Preliminar design, Design for Construction permit, Design for Construction, Main Design for Fire protection, and providing all required administrative documentation |
2017 |
Naftagas – Technical Services |
NM_051600/UD-RA/02065 of 20.02.2017. |
Reconstruction of substations: - STS Banatski dvor - STS Je-101 Jermenovci - LTS Lokve - STS SS-3 Kv 20/0,4 kV 160 kVA – S.Banat - STS KS-1 Mk Zapad 160 kVA – S.Banat - STS KS-2 Mk Zapad 250 kVA – S.Banat - STS KS-3 Mk Zapad 100 kVA – S.Banat MBTS SOS Mk Jug 2 x 630 kVA - S.Banat |
Elaboration of design – technical documentation for the reconstruction of substations |
2016 |
NIS a.d. |
NM_041000/IZ-DO/017540 of 03.11.2016. |
Construction of the weak nitric acid separator – condenser 3.1E-3.11 |
Elaboration of the Design for Construction (PZI) |
2016 |
HIP Azotara |
|
Design of adaptation of line IV of the LDPE plant |
Elaboration of the design – technical documentation and obtaining the all required permits and approvals (Feasibility study, Preliminary Design, Environmental impact assessment study, plan of preventive measures, Main Design of Fire protection systam, Design for Construction Permit, As-Built Design, providing all required administrative and authority documentation and approvals) |
2016/ 2017 |
HIP Petrohemija |
1525/16 of 30.09.2016. |
Development of refinery treatment |
Assesment of the equipment conditions, concrete and steel structures, oily sewage and pipelines on the plant S-2550 LPG MEROX |
2016 |
NIS a.d. |
PRE300000/UD-RA/09616 of 25.08.2016. |
Second phase of revitalization (membranisation) of the part on the boiler furnace OP-380b |
Elaboration of Preliminary Design , Project for Construction and As-Build Design |
2016 |
Power Plant Morava Svilajnac/ RAFAKO |
121/2016 of 08.09.2016. |
Design of the exploitation of alkylates heat from the bottom of the column DA-2601 |
Design for construction permit, Design for construction, As built design |
2016 |
NIS a.d. |
NM_051600/UD-RA/6685 23.06.2016. |
Design of the superheater, connected piping of the intermediate heaters MP1-MP2 and ejection piping on block B2 – TENT B |
Elaboration of the conceptual design, design for construction and as-built design |
2016 |
Power Plant Nikola Tesla/ RAFAKO |
2214 – 1 12.05.2016. |
Adaptation of the instrument air system in the Power Unit Pancevo |
Elaboration of the conceptual solution, Conceptual design, Design for construction permit, Design for construction, As built design, Environmental impact assessment study, providing all required administrative documentation, Equipment procurement and installation of the equipment with the providing of the operation permit. |
2016 |
NIS a.d. |
NM_041000/IZ-DO/006810 of 20.04.2016. |
Adaptation of the drainage system on S-0250 Construction of the closed drainage system in Oil Refinery Pancevo |
Elaboration of the Design for construction and of the As-built design |
2016 |
NIS a.d. MERA Zrenjanin |
PRE400000/UD-RA/04139 of 18.04.2016. |
Construction of a wind power plant |
Elaboration of the impact study of the wind turbines in the protection zone of the product pipelines, technical control of the design. |
2016 |
Wind Vision Vindfarm d.o.o. |
19-2-1-2016 of 01.02.2016. |
Adaptation of the natural gas heating system S-9900 i S-9950 and regulation of the natural gas flow on S-9900 |
Main Design, elaboration of the Environmental impact Assessment study and providing required administrative-technical documentation - approvals for the execution of works |
2016 |
NIS a.d. |
NM_041000/IZ-DO/000030 of 04.01.2016. |
Installation of the cooling and ventilation system for the main process substations TS N1, TS N2 i TS C in Power Unit Pančevo |
Main Design elaboration of the Environmental impact Assessment study, and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
NM_051600/UD-RA/13603 of 23.12.2015. |
Construction of a small power plant SOS Majdan 2,41 MW and construction of the substation and connecting cable line |
Technical control of the Main Design and supervision |
2016 |
NIS a.d. |
NM_051600/UD-RA/12687 of 09.12.2015. |
Design of reconstruction and extension of the system for in line blending of motor petrol |
Technical inspection of the facility, Unit, devices and equipment and executed civil works. |
2015/ 2016 |
NIS a.d. |
PRE390000/UD-RA/11151 of 28.10.2015. |
Design of condensate collection from the steam line outside the main drive Unit into the closed system in the Power Unit - Pančevo |
Main Design and elaboration of the Environmental impact Assessment study providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. GOŠA Montaža |
|
Replacement of the relay protection 6 kV in TS R-old unit, installation of a microprocessing protection device |
Technical control |
2015 |
NIS a.d. |
ENR040000/UD-RA/10580 of 09.10.2015. |
Design of walking lanes in Oil Refinery Pančevo |
Main Design |
2016 |
NIS a.d. |
PRE390000/UD-RA/10057 of 24.09.2015. |
Design of construction of a tank for polymer-bitumen |
Technical inspection of the facility, Unit, devices and equipment and executed civil works. |
2015 |
NIS a.d. |
PRE390000/UD-RA/10003 of 20.09.2015. |
Construction of the heavy gasoline storage (process oil) 100 m3 |
Elaboration of the Urban Development Plan for the construction of the tanks, Elaboration of the FF protection design Study on the hazardous areas and providing required approvals for the execution of works |
2015 |
NIS a.d. GOŠA Montaža |
Contract N° NM_041000/IZ-DO/01531 of 14.07.2015 |
Reconstruction of the FCC Unit – debottlenecking for the operation of the Unit with the capacity 1400 t/day and 1600 t/day in the summer period |
Main Design, diagnostics, technical economical analysis and elaboration of the design for construction |
2015 |
NIS a.d. |
Contract N°r PRE300000/UD-RA/08188 of 28.07.2015. |
Installation of the electric heating on the inlet of GA-2657 and GB-2301 in the Process Unit |
Main Design |
2015 |
NIS a.d. |
Contract N° PRE390000/UD-RA/08101 of 23.07.2015. |
Revamp works on the main lift station on Avenue ''A'' in Refinery Pančevo block 17 |
Main Design, Technical control of the Main Design, and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
Ugovor PRE390000/UD-RA/07629 od 10.07.2015. |
- ATD of the separator S50, vessels S-17 i S-18 and bundle DC-2601 - El. installations in the Refinery Pančevo laboratory - Revamp of the RC pump foundations of the V-tank in the oil blending hall in the Refinery Pančevo |
Main Design |
2015 |
Naftagas Technical Services |
Contract N° THS700000/UD-RA/00854 of 20.07.2015. |
Extension of the Terminal for storage and reloading of oil derivatives |
Main Design |
2015 |
Dunav Oil Team d.o.o. |
Contract N° 515/2015 Of 06.07.2015. |
Revamp works on the complete system of the closed sewage system in Oil Refinery Pančevo |
Main Design, Technical control of the Main Design, survey of underground installations by CCTV and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
Contract N° PRE390000/UD-RA/07627 of 10.07.2015. |
Installation and connection of the new boiler unit 75 t/h to process lines in the Refinery |
Main Design |
2015 |
Oil Refinery Brod |
Contract N° 300 - 567/15 of 17.03.2015. |
Piping lines, classification, record, control, inspection and testing of pressure equipment |
As-Built design of the piping system (PIOC) |
2015 |
NIS a.d. PED Inspect |
Contract N° 150427-1-P011 06.05.2015. |
Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20 |
Main Design |
2015 |
Oil Refinery Brod |
Contract N°146/2015/119K/14 of 20.04.2015. |
Installation of heat exchanger ''Packinox'' on the Catalytic reforming Unit |
Main Design, Plan of preventive measures, Technical control of the design, Environmental impact assessment study and engineering services on providing administrative-technical documentation - approvals for the execution of works |
2016 |
NIS a.d. |
Contract N° PRE390000/UD-RA/06841 of 19.06.2015. |
Installation of strainers on the LPG loading station in Oil Refinery Pančevo |
Technical control of the Main Design |
2015 |
NIS a.d. |
Contract N°. PRE390000/UD-RA/06250 of 08.06.2015. |
Installation of mechanical sealers on the pumps S-2200 |
Main Design |
2015 |
NIS a.d. Teh.servisi |
1934 |
Petrol station for automotive road vehicles |
Technical inspection of the facility |
2015 |
Luka Dunav a.d. Pančevo |
Contract N°. 01-167411 of 04.05.2015. |
Reconstruction of the boiler unit 75 t/h to process lines in the Refinery |
Elaboration of design documentation |
2015 |
Oil Refinery Brod |
Contract N° 300 - 567/15 of 17.03.2015. |
Reconstruction of piping bundles and heat exchangers in the Ammonia III Unit - Reboiler CO2 |
Main Design |
2015 |
HIP Azotara |
Contract N°. 80402-32-80 of 27.02.2015. |
Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20 |
Elaboration of design documentation |
2015 |
Oil Refinery Brod |
Contract N°. 119K/14 of 13.03.2015 |
Ammonia tank revamp |
Main Design |
2014 |
HIP Azotara |
Contract N°141001-80 of 09.12.2014. |
Replacement of the LV Unit in substations TS- E2, TS-L, TS-F and TS-CCR |
Technical control of the Main Design |
2014 |
NIS a.d. |
Contract N°ENR100000/UD- RA/11716 of 26.09.2014. |
Replacement of the LV Unit distribution line of the substation „TS Uljara 1“ |
Main Design |
2014 |
NIS a.d. |
Contract N°NM_041000/UD- RA/10155 of 25.08.2014. |
Piping bundle design DC-2601 and DC-2602 |
Main Design |
2014 |
NIS a.d. |
Contract °NM_041000/UD- RA/9031 of 25.07.2014. |
Installation of frequency regulators and replacement of electrical motors on air coolers S-3600 in Oil Refinery Pančevo |
Main Design and Technical control of the Main Design, Supervision and As-Built -Design |
2014 |
NIS a.d. |
Contract N°THS700000/UD- RA/01373 of 19.09.2014. |
Reconstruction of the Dispatch Building in Oil Refinery Pančevo |
Preliminary and Main design (mechanical, architectural- civil, water supply and sewage, electrical, fire fighting, automatic fire detection, Power Efficiency Study), technical control of the Main Design and obtaining administrative documentation for the issuance of the Construction Permit |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/08864 of 21.07.2014. |
Replacement of pumps GA-2901/S, GA-2902/S i GA-2903/S – turnkey services |
Main Design (mechanical, instrumentation, electrical and civil), execution of works on the pumps installation – designs (mechanical, instrumentation, electrical and civil) |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/6865 of 28.05.2014. |
Fire fighting protection of the Block 6 steel structure - Oil Refinery Pančevo |
Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of Internal |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/04109 of 03.04.2014. |
Replacement of thermal insulation on the water steam lines in Oil Refinery Pančevo |
Main Design |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/04092 of 03.04.2014. |
Installation of process analysers BA-2301 in Oil Refinery Pančevo |
Main Design technological-mechanical |
2014 |
Petroprocess / NIS a.d. |
Contract N°2315-1728 of 07.02.14. |
Replacement of the electrical motor by an energetically more efficient motor (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil). |
2013 |
Siemens / NIS a.d. |
Contract N°10630/J of 10.10.13. |
Adaptation of oil fuel lines for steam boilers - in Oil Refinery Novi Sad |
Main Design (technological-mechanical, instrumentation, electrical). |
2013 |
NIS a.d. |
Contract N°PRE300000/UD- RA/16563 of 01.11.2013. |
Installation of sound barriers on the Hydrogen Generation Unit S-5000 |
Main architectural/civil Design |
2013 |
BMR Group |
Contract N°2301 of 16.10.13. |
Installation of process analyzers on series S-500, S-550 and S-570 in Oil Refinery Pančevo |
Main technological-mechanical Design |
2013 |
Petroprocess / NIS a.d. |
Contract N°2296 of 26.09.13. |
Design of pump and steam turbine replacement by electrical motor on GA-2302 and GA-2305 (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design |
2013 |
Siemens / NIS a.d. |
Contract N°10608/J of 08.10.13. |
Design of frequency regulators on the ventilators of the cooling tower EF-9132 (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2013 |
NIS a.d. |
Contract N°NM_041000/UD- RA/15596 of 09.10.2013. |
Design of the revamp works on the supports and reconstruction of the sampling station on the Hydrogen Generation Unit S-5000 (NIS Oil Refinery Pančevo) |
Main Mechanical Design |
2013 |
Heurtey Petrochem |
Contract / PO N°2287 |
Reconstruction of the valve system on the smoke channel BF-2201 and connection to the control system (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12524 of 26.07.2013. |
Replacement and relocation outside the Ex zone of the 0,4 kV MCC Unit in Block 5 (Oil Refinery Pančevo) |
Conceptual Design with the feasibility study, EIA Study, Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design and engineering services |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/13006 of 08.08.2013. |
Passive fire fighting protection for the skirts of the columns and steel structure of Block 5 (Oil Refinery Pančevo) |
Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of Internal Affairs |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12522 of 26.07.2013. |
VRU Unit on the truck loading station of Oil Refinery Pančevo |
Technical control of the Main Design (documentation in foreign language, supplier ''ACKER KVARNER'') |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/11703 of 09.07.2013.
|
Revitalization of the Unit for the recuperation of gasses from the flare S-1000 (Oil Refinery Pančevo) |
Technical control / nostrification of the As-Built Design (technological-mechanical, instrumentation, electrical) |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12054 of 16.07.2013. |
Replacement of pumps, installation of frequency regulators and replacement of the electrical motors on the centrifugal pump GA-2109 |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/11697 of 09.07.2013. |
Modernization of the installations for bitumen load/offload on the railway and truck loading station, burning out of waste gasses from the storage tanks and installation of the radar gauges and temperature probes on the tanks (Oil Refinery Pančevo) |
Conceptual Design with the feasibility study, EIA Study , Main Design, Technical control of the Main Design and engineering services on providing required approvals and permits
|
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/10451 of 14.06.2013. |
Reconstruction of the batching system S-2600 during the stopped operation of the FCC in Oil Refinery Pančevo |
Elaboration of the Main Design (technological-mechanical, instrumentation, electrical, civil, fire protection, EIA Study, Work Protection Study and Study on the protection against natural disasters), Technical Control of the Main Design and engineering services on providing required approvals and permits |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/9203 |
Replacement of the Main fire fighting line, from point ''B'' to Block 9 and from point S7 to the outlet of the FF pumps on the water source with the connection to the piping from the previous 2phases in Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical Control of the Main Design, As Built Design and engineering services on providing required approvals and permits |
2013 |
NIS a.d. |
Contract N°NM_041530/UD- RA/5897 of 03.04.2013. |
Facility legalization – Reconstruction of the facility and construction of new facilities for waste water processing in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, elaboration of the study on environmental impact of the as-built facility and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P3 of 07.12.2012. |
Facility legalization – Construction and reconstruction of PK4 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N˘N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Facility legalization – Construction and reconstruction PS4 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Facility legalization - Reconstruction of the pump station and extension of the control building, Tanks FB-1501, FB-1502, FB-1503, FB-1504 i FB-1505 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Automatic system for the collection of data related to the measurement of vapor consumption on the Units of Oil Refinery a.d. Brod |
Main Design (technological-mechanical, instrumentation) |
2012 |
Oil Refinery Brod |
Contract N°338/2012 of 04.07.2012. |
Verification of the characteristics of the batch pumps for the MHC-DNT in Oil Refinery Pančevo |
Design of pump characteristics verification |
2012 |
NIS a.d. |
Contract N°IV/32-24/22/1- 1009/KAP/N of 14.06.2012. |
Capacities for the storage of oil derivatives – Storage of main drive fuel for special purposes ''Ledinci'' |
Techno-economical analysis for the development and putting into operation of the storage (elaboration of the schedule and program of required testing, techno- economical analysis and elaboration of technical documentation for the execution of works on the realization of the selected technical solution) |
2012 |
Transnafta a.d. |
Contract N°1964/2012 of 07.09.2012. |
Modernization and erection of control- measuring devices and automated level measurement system on the storage tank facility in Oil Refinery a.d. Brod |
Main Design (mechanical, electrical and instrumentation with 3D modeling), Technical control of the Main Design |
2011/ 2012 |
Rafinerija a.d. Brod |
Contract N°681 of 10.11.2011. |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011/ 2012 |
CB&I / NIS a.d. |
Contract N°02163-2594 |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011 |
Uralhimmach |
Contract N°1448-421/11 of 12.12.2011. |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011/ 2012 |
Heurtey Petrochem s.a. |
Contract N°EF09029-2207-00 |
Terminal for the storage and reloading of oil derivatives - Sremski Karlovci |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2012 |
Naftachem |
Contract N°1/451-11 of 28.09.2011. |
Adaptation of the stock follow up system and measuring of the parameters of the storage tanks - Oil Refinery Novi Sad |
Technical control of the Main Mechanical Design |
2011 |
NIS a.d. |
Contract N°II-32-11-16/25/1- 6124/KAP/N of 31.08.2011 |
Adaptation of the electronic ignition system on the process furnaces HF-101 and HF-901 in Oil Refinery Novi Sad |
Technical control of the Main Design |
2011 |
NIS a.d. |
Contract N°II-32-16/25/1- 5951/KAP/N of 22.08.2011 |
Process pressure equipment |
Strength calculations of the heat exchangers and pressure vessels |
2011 |
HIP Azotara Pančevo |
Contract N°254 of 13.01.2011 |
Adaptation of the facilities within the condensing Unit of "GPO Energetics" in Oil Refinery Pančevo |
Elaboration of the Main Civil Design, Technical control of the Main Design and construction and finishing works |
2010 |
NIS a.d. |
Contract N°05-1/25/1-2403/KAP/N of 23.12.2010. |
Pančevo Oil Refinery Modernization Project |
Elaboration of the design-technical documentation on the workshop level |
2012 |
GOŠA Montaža |
Contract N°305/10 of 27.10.2010. |
Pančevo Oil Refinery Modernization Project – Construction of the Hydrogen Generation Unit |
Main Civil Design |
2012 |
Heurtey Petrochem |
Contract N°EF09029-2209 |
Underground LPG storage tanks. |
Main Design |
2012 |
FEROMONT |
Contract N°1508 of 10.08.2012. |
Reconstruction of the FCC Unit in Oil Refinery Pančevo |
Technical control of the Main Design |
2010 |
NIS a.d. |
Contract N°05-1/25/1-1356/KAP/N of 20.08.2010 |
Closed drainage system of the flare and gas- meter vessels S-1000 in Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), Supervision services |
2010 |
NIS a.d. |
Contract N°05-1/22/1-738/KAP/N of 07.06.2010. |
Reconstruction of the existing dosage system for the neutralization pit FA-2657 |
Main Design (technological-mechanical, instrumentation, electrical and civil), and equipment supply |
2010 |
NIS a.d. |
Contract N°1412/HP of 30.03.2010. |
Reconstruction of the existing facility – Washing and lubricating service Unit for tank trucks in the Control-dispatch centre of Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), and acquiring all legal - administrative documents |
2010 |
NIS a.d. |
Contract N°II-B-84-580 |
Product pipeline system for petroleum products and terminals in Pančevo, Novi Sad and Smederevo
|
Preliminary design, Feasibility Study and Envirenmental Impact assesment study |
2009 |
TRANSNAFTA |
|
Modernization of existing and construction of new refinery plants in order to achieve current European standards
|
Pre-feasibility study (concept of improvement and modernization of existing plants, concept of new process plants, variants of construction of new plants, investment assessment |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
Connection of the Diesel Hydrodesulfurization plant from the New production line 3 MM t / y with the Old production line 2 MM t / y |
Main Design (technological-mechanical, instrumentation) |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
Connection of the Sulfur Production Plant from the New Production Line 3 MM t / y with the Old Production Line 2 MM t / y |
Main Design (technological-mechanical, instrumentation) |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
|
Design of reconstruction and modernization of plants, preparation of as-built documentation (technical assistance in Libya). As part of the reconstruction and modernization project,0.4 kV distribution, 24V DC and 110V DC distribution voltage distribution plant was also designed.
|
2005/ 2008 |
TEKNICA UK LTD London |
Contract AGO-5-P315 |
Adaptations of the water cooling system from the desalter with S-100 and S-2100 |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2008 |
NIS-RNP |
|
Reconstruction of the drainage system in the Bitumen S-0250 plant |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2007 |
NIS-RNP |
|
Aroma storage tanks FB-1101, FB-1103, FB-1106, FB-3601 and FB-3602 with associated piping installations |
Technological-mechanical project of the As-Built design |
2006 |
NIS-RNP |
|
PIDECO Iran - Package LPG treatment plant
|
Main Design (mechanical, instrumentation, electrical and civil) |
2005/ 2006 |
SPG Nemačka |
|
Existing AEG steam turbine 17.6 MW in the Ammonia plant |
Specification, procurement, delivery, installation and commissioning of the reconstructed turbine (new rotor of a different model, new stator blades, manufacturer: NEVSKIJ ZAVOD, St. Petersburg |
2004 |
Nitrogen fertilizer factory ASMIDAL, Arzew, Algeria |
|
BABCOCK & WILCOX boilers 3 x 50 t / h steam |
Main design of replacing the pneumatic automatic control system with digital system |
2003 |
HIP - AZOTARA Pančevo |
|
Construction of a new TONWEI refinery capacity 10 million t / y (11 process plants, energy and off-site installations) |
Feasibility study and General project for the construction of a new Refinery within the conceptual project were elaborated details of the 0.4 kV distribution, as well as the uninterruptible power supply system |
2006 |
Tonwei Investment , Port Harcourt , Nigerija |
|
Rehabilitation of air conditioning installation at the KAN plant |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2005 |
HIP - AZOTARA Pančevo |
|
2. SUPERVISION SERVICES
Facility / Project title |
Activities/Project type |
Year |
Company / Client |
Contract No. |
---|---|---|---|---|
Study with proposed activities to increase the operational efficiency of storage and handling of LPG products |
Elaboration of the design/technical documentation |
In progres |
NIS a.d. |
NM_051600/UD-RA/009279 28.09.2020. |
Harmonization of measuring points for measuring emissions of air pollutants at emitters in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
DWN105000/UD-RA/00650 22.01.2020 |
Furnace protection in case of gas leakage at plants in Oil Refinery Pančevo |
Elaboration of the design/technical documentation |
In progres |
NIS a.d. |
NM_051600/UD-RA/01748 18.02.2020. |
Facility for temporary storage of waste in Zrenjanin |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
NFS780000/UD-RA/00280 04.02.2020. |
Replacement of 6kV power cables for power supply of TS Estara / TS Enova |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
In progres |
NIS a.d. |
DWN115000/UD-RA/02773 06.04.2020 |
Replacement of 0.4 kV plant type T12 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN115000/UD-RA/02773 12.03.2020 |
Integration of PLC 0.4 kV distribution plants (SWG) in Elektro DCS in RNP |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN115000/UD-RA/09566 13.09.2019 |
Increasing the diameter of the overflow pipe FA-1000 towards a closed drainage system in the RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-1 03.02.2020. |
Dosing of steam neutralizer on S-100 in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-2 03.02.2020. |
Reconstruction of pipeline 12 "-P-43-0040-07-01-B01G00A" in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-3 03.02.2020. |
Connection of circulation lines of tanks FB-25301 and FB-25304 in RNP
|
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2020 |
NIS a.d. |
DWN111000/UD-RA/01155-4 03.02.2020. |
Construction of a storage pool of mud (unit 10) in Novo Miloševo |
Elaboration of the design/technical documentation |
2019 |
NIS a.d. |
NFS900000/UD-RA/06054 31.05.2019 |
Terminal for the storage of oil derivatives - Sremski Karlovci |
Development of an environmental impact assessment Study |
2019 |
Eling Plan d.o.o. |
2554 of 23.10.2018. |
Substations : Jermenovci (10/0,4 kV, 160 kVA), Janošik (10/0,4 kV, 60 kVA), Sirakovo (400 kVA), Kikinda (400 kVA), Kikinda (630 kVA), Kikinda (160 kVA), Mokrin (sever 50 kVA) (west 50 kVA), Turija (250 kVA), Turija (400 kVA), |
Elaboration of the simplified mining design for the reconstruction |
2019 |
NIS a.d. |
UPS300000/UD-RA/13893 of 15.11.2018. |
ASTUP unit SLP in Oil Refinery Brod, Bosnia and Herzegovina |
Elaboration of the design for the modernization |
2019 |
SCAN Projkt d.o.o. Zagreb, HR |
35/18 of 24.09.2018. |
Replacement of the burners on process heaters BA-2101 and BA-2301 |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
Turbomehanika / NIS a.d. |
P2599 of 30.08.2018. |
Expertise of the causes for the collapse of the canopy on SSG Novi Sad |
Elaboration of the expertise |
2018 |
NIS a.d. |
PR0650000/UD-RA/09928 Of 17.08.2018. |
Reconstruction and construction of the oil derivatives storages SND Novi Sad, SND Niš and SND Smederevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2019 |
NIS a.d. |
NM_041000/UD-RA/12769 of 22.10.2018. |
Oil field Velebit - Kanjiža |
Elaboration of the design/technical and preparation of the Study on the performed measurements by the LRUT method |
2018 |
NIS a.d. |
UPS300000/UD-RA/08144 Of 03.07.2018. |
Oil Refinery - Šid |
Elaboration of control calculations of process equipment |
2018 |
Victorija Oil |
4500038723 |
Design of the tanks drainage system |
Elaboration of the design / technical documentation for the drainage of 45 tanks into the existing system of oily process waters |
2018 |
Oil Refinery Brod |
181K/18 Of 30.05.2018. |
Construction of the basin for the storage of drilling muds (8 and 9 cartidges) in Novo Miloševo |
Elaboration of the Detail Design |
2018 |
NIS a.d. |
OFS280000/UD-RA/06614 Of 28.05.2018. |
Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
NIS a.d. |
9500086831 Of 25.04.2018. |
Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo |
Elaboration of the design/technical documentation and obtaining all the required permits and approvals |
2018 |
SIEMENS / NIS a.d. |
9500086831 Of 25.04.2018. |
Installation of the louvres on the channels after the FAN ½ for air regulation on the superheaters to the heater BA-2101 |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
NM_051600/UD-RA/07417 of 13.06.2018. |
Installation of the ventilators on the cooling tower |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
UPS300000/UD-RA/5538 Of 03.05.2018. |
Repair of the storage supports in PITING Unit in Elemir |
Elaboration of the design/technical documentation |
2018 |
NIS a.d. |
UPS300000/UD-RA/5538 Of 03.05.2018. |
Development of refinery processing in Oil Refinery Pančevo – Construction of new units |
Technical review of the plant, devices, equipment and executed works |
2018 |
NIS a.d. |
NM_080000/UD-RA/05818 Of 09.05.2018. |
Repair of the piping between the lower MGO and upper MGO zone of the petrol storage Ledinci |
Elaboration of the technical-economical analysis and design/technical documentation |
2018 |
Transnafta a.d. |
1980/1-2018 of 02.03.2018. |
Design for site arrangment for the accomodation of the contractors |
Elaboration of the detail design |
2018 |
NIS a.d. |
PRE390000/UD-RA/01476 of 31.1.2018. |
Design for the replacement of the low-alloy piping S-2200 |
Elaboration of the detail design and checking of the technical documentation by the Notified Body |
2018 |
NIS a.d. |
PRE390000/UD-RA/15047 of 21.12.2018. |
Adaptation of the laboratory on NGP Velebit |
Elaboration of the simplified mining design |
2018 |
NIS a.d. |
UPS300000/UD-RA/03304 Of 14.03.2018. |
Installation of the blind valves on the storage tanks in manipulation |
Elaboration of the Detail Design |
2017 |
NIS a.d. |
PRE 390000/UD-RA/12373 OF 25.10.2017 |
Detail design based on the assessment of the condition of the equipment, concrete and steel structures, oil sewage and piping on S-2550 LPG Merox |
Elaboration of the Detail Design |
2018 |
CB&I/NIS a.d. |
172784-SC-EN-001.01 of 30.10.2017. |
Feasibility Study for the reconstruction of the laboratory building with variant conceptual solution for the reconstruction of the unit for NIS Rafinery Pančevo |
Elaboration of the Feasibility Stydy and Conceptual Solution |
2018 |
NIS a.d. |
NM_051600/UD-RA/14215 of 04.12.2017. |
Replacement of 6 kV supply cable for Substation TS N2 |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
NM_041000/IZ-DO/011914 of 16.08.2017. |
Adaptation of the pigging point on the oil pipeline Elemir – Novi Sad |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
UPS330000/UD-RA/08169 of 12.07.2017. |
Design of reservoir for H2SO4 storage in Power unit Pančevo |
Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation |
2017 |
NIS a.d. |
NM_041000/IZ-DO/08483 of 05.06.2017. |
Refurbishment of fire protection coating on steel construction at VRU at oil station and supporting columns of reservoirs |
Elaboration of design documentation |
2017 |
NIS a.d. |
PRE390000/UD-RA/04637 of 18.04.2017. |
Design of electrical installation of drilling rigs |
Elaboration of design documentation (electro-energetic installations, installation of measurement and regulation, and Explosion Protection Document ) |
2017 |
Naftagas – Oilfield Services |
NFS720000/UD-RA/00309 of 20.04.2017. |
Rehabilitation of interconnection between secondary reformer 103-D and boiler 101-C at NH3 plant III |
Elaboration of design for construction |
2017 |
HIP Azotara -Ammonia Plant Pančevo |
2484 |
Construction of a canopy for oils and lubricants and construction of a canopy for spare part |
Elaboration of Preliminar design, Design for Construction permit, Design for Construction, Main Design for Fire protection, and providing all required administrative documentation |
2017 |
Naftagas – Technical Services |
NM_051600/UD-RA/02065 of 20.02.2017. |
Reconstruction of substations: - STS Banatski dvor - STS Je-101 Jermenovci - LTS Lokve - STS SS-3 Kv 20/0,4 kV 160 kVA – S.Banat - STS KS-1 Mk Zapad 160 kVA – S.Banat - STS KS-2 Mk Zapad 250 kVA – S.Banat - STS KS-3 Mk Zapad 100 kVA – S.Banat MBTS SOS Mk Jug 2 x 630 kVA - S.Banat |
Elaboration of design – technical documentation for the reconstruction of substations |
2016 |
NIS a.d. |
NM_041000/IZ-DO/017540 of 03.11.2016. |
Construction of the weak nitric acid separator – condenser 3.1E-3.11 |
Elaboration of the Design for Construction (PZI) |
2016 |
HIP Azotara |
|
Design of adaptation of line IV of the LDPE plant |
Elaboration of the design – technical documentation and obtaining the all required permits and approvals (Feasibility study, Preliminary Design, Environmental impact assessment study, plan of preventive measures, Main Design of Fire protection systam, Design for Construction Permit, As-Built Design, providing all required administrative and authority documentation and approvals) |
2016/ 2017 |
HIP Petrohemija |
1525/16 of 30.09.2016. |
Development of refinery treatment |
Assesment of the equipment conditions, concrete and steel structures, oily sewage and pipelines on the plant S-2550 LPG MEROX |
2016 |
NIS a.d. |
PRE300000/UD-RA/09616 of 25.08.2016. |
Second phase of revitalization (membranisation) of the part on the boiler furnace OP-380b |
Elaboration of Preliminary Design , Project for Construction and As-Build Design |
2016 |
Power Plant Morava Svilajnac/ RAFAKO |
121/2016 of 08.09.2016. |
Design of the exploitation of alkylates heat from the bottom of the column DA-2601 |
Design for construction permit, Design for construction, As built design |
2016 |
NIS a.d. |
NM_051600/UD-RA/6685 23.06.2016. |
Design of the superheater, connected piping of the intermediate heaters MP1-MP2 and ejection piping on block B2 – TENT B |
Elaboration of the conceptual design, design for construction and as-built design |
2016 |
Power Plant Nikola Tesla/ RAFAKO |
2214 – 1 12.05.2016. |
Adaptation of the instrument air system in the Power Unit Pancevo |
Elaboration of the conceptual solution, Conceptual design, Design for construction permit, Design for construction, As built design, Environmental impact assessment study, providing all required administrative documentation, Equipment procurement and installation of the equipment with the providing of the operation permit. |
2016 |
NIS a.d. |
NM_041000/IZ-DO/006810 of 20.04.2016. |
Adaptation of the drainage system on S-0250 Construction of the closed drainage system in Oil Refinery Pancevo |
Elaboration of the Design for construction and of the As-built design |
2016 |
NIS a.d. MERA Zrenjanin |
PRE400000/UD-RA/04139 of 18.04.2016. |
Construction of a wind power plant |
Elaboration of the impact study of the wind turbines in the protection zone of the product pipelines, technical control of the design. |
2016 |
Wind Vision Vindfarm d.o.o. |
19-2-1-2016 of 01.02.2016. |
Adaptation of the natural gas heating system S-9900 i S-9950 and regulation of the natural gas flow on S-9900 |
Main Design, elaboration of the Environmental impact Assessment study and providing required administrative-technical documentation - approvals for the execution of works |
2016 |
NIS a.d. |
NM_041000/IZ-DO/000030 of 04.01.2016. |
Installation of the cooling and ventilation system for the main process substations TS N1, TS N2 i TS C in Power Unit Pančevo |
Main Design elaboration of the Environmental impact Assessment study, and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
NM_051600/UD-RA/13603 of 23.12.2015. |
Construction of a small power plant SOS Majdan 2,41 MW and construction of the substation and connecting cable line |
Technical control of the Main Design and supervision |
2016 |
NIS a.d. |
NM_051600/UD-RA/12687 of 09.12.2015. |
Design of reconstruction and extension of the system for in line blending of motor petrol |
Technical inspection of the facility, Unit, devices and equipment and executed civil works. |
2015/ 2016 |
NIS a.d. |
PRE390000/UD-RA/11151 of 28.10.2015. |
Design of condensate collection from the steam line outside the main drive Unit into the closed system in the Power Unit - Pančevo |
Main Design and elaboration of the Environmental impact Assessment study providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. GOŠA Montaža |
|
Replacement of the relay protection 6 kV in TS R-old unit, installation of a microprocessing protection device |
Technical control |
2015 |
NIS a.d. |
ENR040000/UD-RA/10580 of 09.10.2015. |
Design of walking lanes in Oil Refinery Pančevo |
Main Design |
2016 |
NIS a.d. |
PRE390000/UD-RA/10057 of 24.09.2015. |
Design of construction of a tank for polymer-bitumen |
Technical inspection of the facility, Unit, devices and equipment and executed civil works. |
2015 |
NIS a.d. |
PRE390000/UD-RA/10003 of 20.09.2015. |
Construction of the heavy gasoline storage (process oil) 100 m3 |
Elaboration of the Urban Development Plan for the construction of the tanks, Elaboration of the FF protection design Study on the hazardous areas and providing required approvals for the execution of works |
2015 |
NIS a.d. GOŠA Montaža |
Contract N° NM_041000/IZ-DO/01531 of 14.07.2015 |
Reconstruction of the FCC Unit – debottlenecking for the operation of the Unit with the capacity 1400 t/day and 1600 t/day in the summer period |
Main Design, diagnostics, technical economical analysis and elaboration of the design for construction |
2015 |
NIS a.d. |
Contract N°r PRE300000/UD-RA/08188 of 28.07.2015. |
Installation of the electric heating on the inlet of GA-2657 and GB-2301 in the Process Unit |
Main Design |
2015 |
NIS a.d. |
Contract N° PRE390000/UD-RA/08101 of 23.07.2015. |
Revamp works on the main lift station on Avenue ''A'' in Refinery Pančevo block 17 |
Main Design, Technical control of the Main Design, and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
Ugovor PRE390000/UD-RA/07629 od 10.07.2015. |
- ATD of the separator S50, vessels S-17 i S-18 and bundle DC-2601 - El. installations in the Refinery Pančevo laboratory - Revamp of the RC pump foundations of the V-tank in the oil blending hall in the Refinery Pančevo |
Main Design |
2015 |
Naftagas Technical Services |
Contract N° THS700000/UD-RA/00854 of 20.07.2015. |
Extension of the Terminal for storage and reloading of oil derivatives |
Main Design |
2015 |
Dunav Oil Team d.o.o. |
Contract N° 515/2015 Of 06.07.2015. |
Revamp works on the complete system of the closed sewage system in Oil Refinery Pančevo |
Main Design, Technical control of the Main Design, survey of underground installations by CCTV and providing required administrative-technical documentation - approvals for the execution of works |
2015 |
NIS a.d. |
Contract N° PRE390000/UD-RA/07627 of 10.07.2015. |
Installation and connection of the new boiler unit 75 t/h to process lines in the Refinery |
Main Design |
2015 |
Oil Refinery Brod |
Contract N° 300 - 567/15 of 17.03.2015. |
Piping lines, classification, record, control, inspection and testing of pressure equipment |
As-Built design of the piping system (PIOC) |
2015 |
NIS a.d. PED Inspect |
Contract N° 150427-1-P011 06.05.2015. |
Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20 |
Main Design |
2015 |
Oil Refinery Brod |
Contract N°146/2015/119K/14 of 20.04.2015. |
Installation of heat exchanger ''Packinox'' on the Catalytic reforming Unit |
Main Design, Plan of preventive measures, Technical control of the design, Environmental impact assessment study and engineering services on providing administrative-technical documentation - approvals for the execution of works |
2016 |
NIS a.d. |
Contract N° PRE390000/UD-RA/06841 of 19.06.2015. |
Installation of strainers on the LPG loading station in Oil Refinery Pančevo |
Technical control of the Main Design |
2015 |
NIS a.d. |
Contract N°. PRE390000/UD-RA/06250 of 08.06.2015. |
Installation of mechanical sealers on the pumps S-2200 |
Main Design |
2015 |
NIS a.d. Teh.servisi |
1934 |
Petrol station for automotive road vehicles |
Technical inspection of the facility |
2015 |
Luka Dunav a.d. Pančevo |
Contract N°. 01-167411 of 04.05.2015. |
Reconstruction of the boiler unit 75 t/h to process lines in the Refinery |
Elaboration of design documentation |
2015 |
Oil Refinery Brod |
Contract N° 300 - 567/15 of 17.03.2015. |
Reconstruction of piping bundles and heat exchangers in the Ammonia III Unit - Reboiler CO2 |
Main Design |
2015 |
HIP Azotara |
Contract N°. 80402-32-80 of 27.02.2015. |
Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20 |
Elaboration of design documentation |
2015 |
Oil Refinery Brod |
Contract N°. 119K/14 of 13.03.2015 |
Ammonia tank revamp |
Main Design |
2014 |
HIP Azotara |
Contract N°141001-80 of 09.12.2014. |
Replacement of the LV Unit in substations TS- E2, TS-L, TS-F and TS-CCR |
Technical control of the Main Design |
2014 |
NIS a.d. |
Contract N°ENR100000/UD- RA/11716 of 26.09.2014. |
Replacement of the LV Unit distribution line of the substation „TS Uljara 1“ |
Main Design |
2014 |
NIS a.d. |
Contract N°NM_041000/UD- RA/10155 of 25.08.2014. |
Piping bundle design DC-2601 and DC-2602 |
Main Design |
2014 |
NIS a.d. |
Contract °NM_041000/UD- RA/9031 of 25.07.2014. |
Installation of frequency regulators and replacement of electrical motors on air coolers S-3600 in Oil Refinery Pančevo |
Main Design and Technical control of the Main Design, Supervision and As-Built -Design |
2014 |
NIS a.d. |
Contract N°THS700000/UD- RA/01373 of 19.09.2014. |
Reconstruction of the Dispatch Building in Oil Refinery Pančevo |
Preliminary and Main design (mechanical, architectural- civil, water supply and sewage, electrical, fire fighting, automatic fire detection, Power Efficiency Study), technical control of the Main Design and obtaining administrative documentation for the issuance of the Construction Permit |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/08864 of 21.07.2014. |
Replacement of pumps GA-2901/S, GA-2902/S i GA-2903/S – turnkey services |
Main Design (mechanical, instrumentation, electrical and civil), execution of works on the pumps installation – designs (mechanical, instrumentation, electrical and civil) |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/6865 of 28.05.2014. |
Fire fighting protection of the Block 6 steel structure - Oil Refinery Pančevo |
Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of Internal |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/04109 of 03.04.2014. |
Replacement of thermal insulation on the water steam lines in Oil Refinery Pančevo |
Main Design |
2014 |
NIS a.d. |
Contract N°PRE390000/UD- RA/04092 of 03.04.2014. |
Installation of process analysers BA-2301 in Oil Refinery Pančevo |
Main Design technological-mechanical |
2014 |
Petroprocess / NIS a.d. |
Contract N°2315-1728 of 07.02.14. |
Replacement of the electrical motor by an energetically more efficient motor (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil). |
2013 |
Siemens / NIS a.d. |
Contract N°10630/J of 10.10.13. |
Adaptation of oil fuel lines for steam boilers - in Oil Refinery Novi Sad |
Main Design (technological-mechanical, instrumentation, electrical). |
2013 |
NIS a.d. |
Contract N°PRE300000/UD- RA/16563 of 01.11.2013. |
Installation of sound barriers on the Hydrogen Generation Unit S-5000 |
Main architectural/civil Design |
2013 |
BMR Group |
Contract N°2301 of 16.10.13. |
Installation of process analyzers on series S-500, S-550 and S-570 in Oil Refinery Pančevo |
Main technological-mechanical Design |
2013 |
Petroprocess / NIS a.d. |
Contract N°2296 of 26.09.13. |
Design of pump and steam turbine replacement by electrical motor on GA-2302 and GA-2305 (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design |
2013 |
Siemens / NIS a.d. |
Contract N°10608/J of 08.10.13. |
Design of frequency regulators on the ventilators of the cooling tower EF-9132 (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2013 |
NIS a.d. |
Contract N°NM_041000/UD- RA/15596 of 09.10.2013. |
Design of the revamp works on the supports and reconstruction of the sampling station on the Hydrogen Generation Unit S-5000 (NIS Oil Refinery Pančevo) |
Main Mechanical Design |
2013 |
Heurtey Petrochem |
Contract / PO N°2287 |
Reconstruction of the valve system on the smoke channel BF-2201 and connection to the control system (Oil Refinery Pančevo) |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12524 of 26.07.2013. |
Replacement and relocation outside the Ex zone of the 0,4 kV MCC Unit in Block 5 (Oil Refinery Pančevo) |
Conceptual Design with the feasibility study, EIA Study, Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design and engineering services |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/13006 of 08.08.2013. |
Passive fire fighting protection for the skirts of the columns and steel structure of Block 5 (Oil Refinery Pančevo) |
Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of Internal Affairs |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12522 of 26.07.2013. |
VRU Unit on the truck loading station of Oil Refinery Pančevo |
Technical control of the Main Design (documentation in foreign language, supplier ''ACKER KVARNER'') |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/11703 of 09.07.2013.
|
Revitalization of the Unit for the recuperation of gasses from the flare S-1000 (Oil Refinery Pančevo) |
Technical control / nostrification of the As-Built Design (technological-mechanical, instrumentation, electrical) |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/12054 of 16.07.2013. |
Replacement of pumps, installation of frequency regulators and replacement of the electrical motors on the centrifugal pump GA-2109 |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/11697 of 09.07.2013. |
Modernization of the installations for bitumen load/offload on the railway and truck loading station, burning out of waste gasses from the storage tanks and installation of the radar gauges and temperature probes on the tanks (Oil Refinery Pančevo) |
Conceptual Design with the feasibility study, EIA Study , Main Design, Technical control of the Main Design and engineering services on providing required approvals and permits
|
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/10451 of 14.06.2013. |
Reconstruction of the batching system S-2600 during the stopped operation of the FCC in Oil Refinery Pančevo |
Elaboration of the Main Design (technological-mechanical, instrumentation, electrical, civil, fire protection, EIA Study, Work Protection Study and Study on the protection against natural disasters), Technical Control of the Main Design and engineering services on providing required approvals and permits |
2013 |
NIS a.d. |
Contract N°PRE330000/UD- RA/9203 |
Replacement of the Main fire fighting line, from point ''B'' to Block 9 and from point S7 to the outlet of the FF pumps on the water source with the connection to the piping from the previous 2phases in Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical Control of the Main Design, As Built Design and engineering services on providing required approvals and permits |
2013 |
NIS a.d. |
Contract N°NM_041530/UD- RA/5897 of 03.04.2013. |
Facility legalization – Reconstruction of the facility and construction of new facilities for waste water processing in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, elaboration of the study on environmental impact of the as-built facility and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P3 of 07.12.2012. |
Facility legalization – Construction and reconstruction of PK4 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N˘N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Facility legalization – Construction and reconstruction PS4 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Facility legalization - Reconstruction of the pump station and extension of the control building, Tanks FB-1501, FB-1502, FB-1503, FB-1504 i FB-1505 in Oil Refinery Pančevo |
Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design and engineering services on providing required approvals and permits |
2012/ 2013 |
NIS a.d. |
Contract N°N/32-26/22/1- 435/KAP/N/P5 of 07.12.2012. |
Automatic system for the collection of data related to the measurement of vapor consumption on the Units of Oil Refinery a.d. Brod |
Main Design (technological-mechanical, instrumentation) |
2012 |
Oil Refinery Brod |
Contract N°338/2012 of 04.07.2012. |
Verification of the characteristics of the batch pumps for the MHC-DNT in Oil Refinery Pančevo |
Design of pump characteristics verification |
2012 |
NIS a.d. |
Contract N°IV/32-24/22/1- 1009/KAP/N of 14.06.2012. |
Capacities for the storage of oil derivatives – Storage of main drive fuel for special purposes ''Ledinci'' |
Techno-economical analysis for the development and putting into operation of the storage (elaboration of the schedule and program of required testing, techno- economical analysis and elaboration of technical documentation for the execution of works on the realization of the selected technical solution) |
2012 |
Transnafta a.d. |
Contract N°1964/2012 of 07.09.2012. |
Modernization and erection of control- measuring devices and automated level measurement system on the storage tank facility in Oil Refinery a.d. Brod |
Main Design (mechanical, electrical and instrumentation with 3D modeling), Technical control of the Main Design |
2011/ 2012 |
Rafinerija a.d. Brod |
Contract N°681 of 10.11.2011. |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011/ 2012 |
CB&I / NIS a.d. |
Contract N°02163-2594 |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011 |
Uralhimmach |
Contract N°1448-421/11 of 12.12.2011. |
Pančevo Oil Refinery Modernization Project |
Elaboration of control strength calculation and nostrification of pressure vessels |
2011/ 2012 |
Heurtey Petrochem s.a. |
Contract N°EF09029-2207-00 |
Terminal for the storage and reloading of oil derivatives - Sremski Karlovci |
Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design |
2012 |
Naftachem |
Contract N°1/451-11 of 28.09.2011. |
Adaptation of the stock follow up system and measuring of the parameters of the storage tanks - Oil Refinery Novi Sad |
Technical control of the Main Mechanical Design |
2011 |
NIS a.d. |
Contract N°II-32-11-16/25/1- 6124/KAP/N of 31.08.2011 |
Adaptation of the electronic ignition system on the process furnaces HF-101 and HF-901 in Oil Refinery Novi Sad |
Technical control of the Main Design |
2011 |
NIS a.d. |
Contract N°II-32-16/25/1- 5951/KAP/N of 22.08.2011 |
Process pressure equipment |
Strength calculations of the heat exchangers and pressure vessels |
2011 |
HIP Azotara Pančevo |
Contract N°254 of 13.01.2011 |
Adaptation of the facilities within the condensing Unit of "GPO Energetics" in Oil Refinery Pančevo |
Elaboration of the Main Civil Design, Technical control of the Main Design and construction and finishing works |
2010 |
NIS a.d. |
Contract N°05-1/25/1-2403/KAP/N of 23.12.2010. |
Pančevo Oil Refinery Modernization Project |
Elaboration of the design-technical documentation on the workshop level |
2012 |
GOŠA Montaža |
Contract N°305/10 of 27.10.2010. |
Pančevo Oil Refinery Modernization Project – Construction of the Hydrogen Generation Unit |
Main Civil Design |
2012 |
Heurtey Petrochem |
Contract N°EF09029-2209 |
Underground LPG storage tanks. |
Main Design |
2012 |
FEROMONT |
Contract N°1508 of 10.08.2012. |
Reconstruction of the FCC Unit in Oil Refinery Pančevo |
Technical control of the Main Design |
2010 |
NIS a.d. |
Contract N°05-1/25/1-1356/KAP/N of 20.08.2010 |
Closed drainage system of the flare and gas- meter vessels S-1000 in Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), Supervision services |
2010 |
NIS a.d. |
Contract N°05-1/22/1-738/KAP/N of 07.06.2010. |
Reconstruction of the existing dosage system for the neutralization pit FA-2657 |
Main Design (technological-mechanical, instrumentation, electrical and civil), and equipment supply |
2010 |
NIS a.d. |
Contract N°1412/HP of 30.03.2010. |
Reconstruction of the existing facility – Washing and lubricating service Unit for tank trucks in the Control-dispatch centre of Oil Refinery Pančevo |
Main Design (technological-mechanical, instrumentation, electrical and civil), and acquiring all legal - administrative documents |
2010 |
NIS a.d. |
Contract N°II-B-84-580 |
Product pipeline system for petroleum products and terminals in Pančevo, Novi Sad and Smederevo
|
Preliminary design, Feasibility Study and Envirenmental Impact assesment study |
2009 |
TRANSNAFTA |
|
Modernization of existing and construction of new refinery plants in order to achieve current European standards
|
Pre-feasibility study (concept of improvement and modernization of existing plants, concept of new process plants, variants of construction of new plants, investment assessment |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
Connection of the Diesel Hydrodesulfurization plant from the New production line 3 MM t / y with the Old production line 2 MM t / y |
Main Design (technological-mechanical, instrumentation) |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
Connection of the Sulfur Production Plant from the New Production Line 3 MM t / y with the Old Production Line 2 MM t / y |
Main Design (technological-mechanical, instrumentation) |
2009 |
ZARUBEZNJEFT Bosanski Brod Olil Refinery |
|
|
Design of reconstruction and modernization of plants, preparation of as-built documentation (technical assistance in Libya). As part of the reconstruction and modernization project,0.4 kV distribution, 24V DC and 110V DC distribution voltage distribution plant was also designed.
|
2005/ 2008 |
TEKNICA UK LTD London |
Contract AGO-5-P315 |
Adaptations of the water cooling system from the desalter with S-100 and S-2100 |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2008 |
NIS-RNP |
|
Reconstruction of the drainage system in the Bitumen S-0250 plant |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2007 |
NIS-RNP |
|
Aroma storage tanks FB-1101, FB-1103, FB-1106, FB-3601 and FB-3602 with associated piping installations |
Technological-mechanical project of the As-Built design |
2006 |
NIS-RNP |
|
PIDECO Iran - Package LPG treatment plant
|
Main Design (mechanical, instrumentation, electrical and civil) |
2005/ 2006 |
SPG Nemačka |
|
Existing AEG steam turbine 17.6 MW in the Ammonia plant |
Specification, procurement, delivery, installation and commissioning of the reconstructed turbine (new rotor of a different model, new stator blades, manufacturer: NEVSKIJ ZAVOD, St. Petersburg |
2004 |
Nitrogen fertilizer factory ASMIDAL, Arzew, Algeria |
|
BABCOCK & WILCOX boilers 3 x 50 t / h steam |
Main design of replacing the pneumatic automatic control system with digital system |
2003 |
HIP - AZOTARA Pančevo |
|
Construction of a new TONWEI refinery capacity 10 million t / y (11 process plants, energy and off-site installations) |
Feasibility study and General project for the construction of a new Refinery within the conceptual project were elaborated details of the 0.4 kV distribution, as well as the uninterruptible power supply system |
2006 |
Tonwei Investment , Port Harcourt , Nigerija |
|
Rehabilitation of air conditioning installation at the KAN plant |
Main Design (technological-mechanical, instrumentation, electrical and civil) |
2005 |
HIP - AZOTARA Pančevo |
|
3. TECHNICAL INSPECTION OF FACILITIES
Facility / Project title |
Activities/Project type |
Year |
Company / Client |
Contract No. |
---|---|---|---|---|
Development of refinery processing in Oil Refinery Pančevo – NIS Gaspromnjeft (Delayed coking unit - DCU with auxiliary facilities and interconnecting units) |
The Commission for technical inspection and verification of performed works and installed plants |
In progress |
NIS a.d. Gastrans d.o.o. |
NM_080000/UD-RA/05818 09.05.2018. |
Construction of three spherical tanks for storage of LPG (propylene, C4 mix) S-16800 in the Pančevo Oil Refinery |
The Commission for technical inspection and verification of performed works and installed plants |
2020. |
NIS a.d. Refining |
NM_080000/UD-RA/05818 09.05.2018. |
Reconstruction of the plant - LPG Merox III S-2550 in the Pančevo Oil Refinery |
The Commission for technical inspection and verification of performed works and installed plants |
In progress |
NIS a.d. Refining |
NM_080000/UD-RA/05818 09.05.2018. |
Reconstruction of MHC / DHT S-4300 plant in Pancevo Oil Refinery |
The Commission for technical inspection and verification of performed works and installed plants |
In progress |
NIS a.d. Refining |
NM_080000/UD-RA/05818 09.05.2018. |
Reconstruction of the plant - SRU II S-4450 in the Pancevo Oil Refinery |
The Commission for technical inspection and verification of performed works and installed plants |
In progress |
NIS a.d. Refining |
NM_080000/UD-RA/05818 09.05.2018. |
Reconstruction of existing facilities in manipulation and installation of new equipment in order to adjust the system for the deep processing plant in the Pancevo Oil Refinery |
The Commission for technical inspection and verification of performed works and installed plants |
In progress |
NIS a.d. Refining |
NM_080000/UD-RA/05818 09.05.2018. |
Reconstruction of the FB-1109 tank in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Reconstruction of the FB-0805 tank in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Harmonization of the jet fuel system with the requirements of the JIG 153, Block 13, 16, 20 and 24 standards in the Pančevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Reconstruction of the FB-0807 tank in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Reconstruction of the FB-2003 tank in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Reconstruction of the railway filling station by installing loading arms for lower filling of aromas in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
Reconstruction of the FB-0711 and FB-0714 tanks in the Pancevo Oil Refinery |
Technical inspection of the facility and executed works and first control of installations in explosion danger zones |
In progress |
NIS a.d. Refining |
DWN105000/UD-RA/11752/2020 03.12.2020. |
New energy corridor in the wider zone of the state road IA (Highway E-75), namely: Gas pipelines RG 04-11 and RG 04-11 / II; Oil pipelines DN1 and DN2; NNS and ENS oil pipelines |
Technical inspection of the facility |
In progress |
Srbijagas |
18-11250 of 01.11.2018. |
In-line blending of motor gasolines |
Technical inspection of the facility, Unit, devices and equipment and executed works. |
2016 |
NIS a.d. Refining |
PRE390000/UD-RA/11151 28.10.2015. |
The construction of a tank for polymer-bitumen |
Technical inspection of the facility, Unit, devices and equipment and executed works. |
2016 |
NIS a.d. Refining |
PRE390000/UD-RA/10003 20.09.2015. |
Petrol station for automotive road vehicles |
Technical inspection of the facility |
2015 |
Luka Dunav a.d. Pančevo |
01-167411 of 04.05.2015. |