1. DESIGNING, TECHNICAL CONTROL OF THE DESIGN DOCUMENTATION, SUPERVISION, ENGINEERING SERVICES ON PROVIDING REQUIRED APPROVALS AND PERMITS

 

Facility / Project title

Activities/Project type

Year

Investor / Client

Contract No.

Study with proposed activities to increase the operational efficiency of storage and handling of LPG products

Elaboration of the design/technical documentation

In progres

NIS a.d.

NM_051600/UD-RA/009279 28.09.2020.

Harmonization of measuring points for measuring emissions of air pollutants at emitters in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

DWN105000/UD-RA/00650 22.01.2020

Furnace protection in case of gas leakage at plants in Oil Refinery Pančevo

Elaboration of the design/technical documentation

In progres

NIS a.d.

NM_051600/UD-RA/01748 18.02.2020.

Facility for temporary storage of waste in Zrenjanin

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

NFS780000/UD-RA/00280 04.02.2020.

Replacement of 6kV power cables for power supply of TS Estara / TS Enova

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

DWN115000/UD-RA/02773 06.04.2020

Replacement of 0.4 kV plant type T12 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN115000/UD-RA/02773 12.03.2020

Integration of PLC 0.4 kV distribution plants (SWG) in Elektro DCS in RNP

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN115000/UD-RA/09566 13.09.2019

Increasing the diameter of the overflow pipe FA-1000 towards a closed drainage system in the RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-1 03.02.2020.

Dosing of steam neutralizer on S-100 in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-2 03.02.2020.

Reconstruction of pipeline 12 "-P-43-0040-07-01-B01G00A" in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-3 03.02.2020.

Connection of circulation lines of tanks FB-25301 and FB-25304 in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-4 03.02.2020.

Construction of a storage pool of mud (unit 10) in Novo Miloševo

Elaboration of the design/technical documentation

2019

NIS a.d.

NFS900000/UD-RA/06054 31.05.2019

Terminal for the storage of oil derivatives - Sremski Karlovci

Development of an environmental impact assessment Study

2019

Eling Plan d.o.o.

2554 of 23.10.2018.

Substations  : Jermenovci (10/0,4 kV, 160 kVA), Janošik (10/0,4 kV, 60 kVA), Sirakovo (400 kVA), Kikinda (400 kVA), Kikinda (630 kVA), Kikinda (160 kVA), Mokrin (sever 50 kVA) (west 50 kVA), Turija (250 kVA), Turija (400 kVA),

Elaboration of the simplified mining design for the reconstruction

2019

NIS a.d.

UPS300000/UD-RA/13893 of 15.11.2018.

ASTUP unit SLP in Oil Refinery Brod, Bosnia and Herzegovina

Elaboration of the design for the modernization

2019

SCAN Projkt d.o.o. Zagreb, HR

35/18 of 24.09.2018.

Replacement of the burners on process heaters   BA-2101 and BA-2301

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

Turbomehanika / NIS a.d.

P2599 of 30.08.2018.

Expertise of the causes for the collapse of the canopy on SSG Novi Sad

Elaboration of the expertise

2018

NIS a.d.

PR0650000/UD-RA/09928

Of 17.08.2018.

Reconstruction and construction of the oil derivatives storages  SND Novi Sad, SND Niš and SND Smederevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2019

NIS a.d.

NM_041000/UD-RA/12769 of 22.10.2018.

Oil field Velebit - Kanjiža

Elaboration of the design/technical and preparation of the Study on the performed measurements by the LRUT method

2018

NIS a.d.

UPS300000/UD-RA/08144

Of 03.07.2018.

Oil Refinery - Šid

Elaboration of control calculations of process equipment

2018

Victorija Oil

4500038723

Design of the tanks drainage system

Elaboration of the design / technical documentation for the drainage of  45 tanks into the existing system of oily process waters

2018

Oil Refinery Brod

181K/18

Of 30.05.2018.

Construction of the basin for the storage of drilling muds  (8 and 9 cartidges) in Novo Miloševo

Elaboration of the Detail Design

2018

NIS a.d.

OFS280000/UD-RA/06614

Of 28.05.2018.

Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

NIS a.d.

9500086831

Of 25.04.2018.

Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

SIEMENS /

NIS a.d.

9500086831

Of 25.04.2018.

Installation of the louvres on the channels after the FAN ½ for air regulation on the superheaters to the heater BA-2101

Elaboration of the design/technical documentation

2018

NIS a.d.

NM_051600/UD-RA/07417

of 13.06.2018.

Installation of the ventilators on the cooling tower

Elaboration of the design/technical documentation

2018

NIS a.d.

UPS300000/UD-RA/5538

Of 03.05.2018.

Repair of the storage supports in PITING Unit in Elemir

Elaboration of the design/technical documentation

2018

NIS a.d.

UPS300000/UD-RA/5538

Of 03.05.2018.

Development  of refinery processing in Oil Refinery Pančevo – Construction of new units

Technical review of the plant, devices,  equipment and executed works

2018

NIS a.d.

NM_080000/UD-RA/05818

Of 09.05.2018.

Repair of the piping between the lower MGO and upper MGO zone of the petrol storage Ledinci

Elaboration of the technical-economical analysis and design/technical documentation

2018

Transnafta a.d.

1980/1-2018

of 02.03.2018.

Design for site arrangment for the accomodation of the contractors

Elaboration of the detail design

2018

NIS a.d.

PRE390000/UD-RA/01476 of 31.1.2018.

Design for the replacement of the low-alloy piping S-2200

Elaboration of the detail design and checking of the technical documentation by the Notified Body

2018

NIS a.d.

PRE390000/UD-RA/15047 of 21.12.2018.

Adaptation of the laboratory on NGP Velebit

Elaboration of the simplified mining design

2018

NIS a.d.

UPS300000/UD-RA/03304

Of 14.03.2018.

Installation of the blind valves on the storage tanks in manipulation

Elaboration of the Detail Design

2017

NIS a.d.

PRE 390000/UD-RA/12373 OF 25.10.2017

Detail design based on the assessment of the condition of the equipment, concrete and steel structures, oil sewage and piping on S-2550 LPG Merox

Elaboration of the Detail Design

2018

CB&I/NIS a.d.

172784-SC-EN-001.01 of 30.10.2017.

Feasibility Study for the reconstruction of the laboratory building with variant conceptual solution for the reconstruction of the unit for NIS Rafinery Pančevo

Elaboration of the Feasibility Stydy and Conceptual Solution

2018

NIS a.d.

NM_051600/UD-RA/14215 of 04.12.2017.

Replacement  of 6 kV supply cable for Substation TS N2

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

NM_041000/IZ-DO/011914 of 16.08.2017.

Adaptation of the pigging point on the oil pipeline Elemir – Novi Sad

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

UPS330000/UD-RA/08169 of 12.07.2017.

Design of reservoir for H2SO4 storage in Power unit Pančevo

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

NM_041000/IZ-DO/08483 of 05.06.2017.

Refurbishment of fire protection coating on steel construction at VRU at oil station and supporting columns of reservoirs

Elaboration of design documentation

2017

NIS a.d.

PRE390000/UD-RA/04637 of 18.04.2017.

Design of electrical installation of drilling rigs

Elaboration of design documentation (electro-energetic installations, installation of measurement and regulation, and Explosion Protection Document )

2017

Naftagas – Oilfield Services

NFS720000/UD-RA/00309 of 20.04.2017.

Rehabilitation of interconnection between secondary reformer 103-D and boiler 101-C at NH3 plant III

Elaboration of design for construction

2017

HIP Azotara  -Ammonia Plant Pančevo

2484

Construction of a canopy  for oils and lubricants and construction of a canopy for spare part

Elaboration of Preliminar design, Design for Construction permit, Design for Construction, Main Design for Fire protection, and providing all required administrative documentation

2017

Naftagas – Technical Services

NM_051600/UD-RA/02065 of 20.02.2017.

Reconstruction of substations:

-       STS Banatski dvor

-       STS Je-101 Jermenovci

-       LTS Lokve

-       STS SS-3 Kv 20/0,4 kV 160 kVA – S.Banat

-       STS KS-1 Mk Zapad 160 kVA – S.Banat

-       STS KS-2 Mk Zapad 250 kVA – S.Banat

-       STS KS-3 Mk Zapad 100 kVA – S.Banat

MBTS SOS Mk Jug 2 x 630 kVA -  S.Banat

Elaboration of design – technical documentation for the reconstruction of substations

2016

NIS a.d.

NM_041000/IZ-DO/017540 of 03.11.2016.

Construction of the weak nitric acid separator – condenser 3.1E-3.11

Elaboration of the Design for Construction (PZI)

2016

HIP Azotara

 

Design of adaptation of  line IV

of the LDPE plant

Elaboration of the design – technical documentation and obtaining the all required permits and approvals (Feasibility study, Preliminary Design, Environmental impact assessment study, plan of preventive measures, Main Design of Fire protection systam, Design for Construction Permit, As-Built Design, providing all required administrative and authority documentation and approvals)

2016/

2017

HIP Petrohemija

1525/16 of 30.09.2016.

Development of refinery treatment

Assesment of the equipment conditions, concrete and steel structures, oily sewage and pipelines on the plant S-2550 LPG MEROX

2016

NIS a.d.

PRE300000/UD-RA/09616 of 25.08.2016.

Second phase of revitalization (membranisation) of the part on the boiler furnace  OP-380b

Elaboration of Preliminary Design , Project for Construction and As-Build Design

2016

Power Plant Morava Svilajnac/

RAFAKO

121/2016 of 08.09.2016.

Design of the exploitation of alkylates heat from the bottom of the column DA-2601

Design for construction permit, Design for construction, As built design

2016

NIS a.d.

NM_051600/UD-RA/6685  23.06.2016.

Design of the superheater, connected piping of the intermediate heaters  MP1-MP2 and ejection piping on block B2 – TENT B

Elaboration of the conceptual design, design for construction and as-built design

2016

Power Plant Nikola Tesla/

RAFAKO

2214 – 1

12.05.2016.

Adaptation of the instrument air system in the Power Unit  Pancevo

Elaboration of the conceptual solution, Conceptual design, Design for construction permit, Design for construction, As built design, Environmental impact assessment study, providing all required administrative documentation, Equipment procurement and installation of the equipment with the providing of the operation permit.

2016

NIS a.d.

NM_041000/IZ-DO/006810 of 20.04.2016.

Adaptation of the drainage system on S-0250

Construction of the closed drainage system in Oil Refinery Pancevo

Elaboration of the Design for construction and

of the As-built design

2016

NIS a.d.

MERA Zrenjanin

PRE400000/UD-RA/04139 of 18.04.2016.

Construction of a wind power plant

Elaboration of the impact study of the wind turbines in the protection zone of the product pipelines, technical control of the design.

2016

Wind Vision Vindfarm d.o.o.

19-2-1-2016 of

01.02.2016.

Adaptation of the natural gas heating system S-9900 i S-9950 and regulation of the natural gas flow on S-9900

Main Design, elaboration of the Environmental impact Assessment study and providing required administrative-technical documentation - approvals for the execution of works

2016

NIS a.d.

NM_041000/IZ-DO/000030 of 04.01.2016.

Installation of the cooling and ventilation system for the main process substations TS N1, TS N2 i TS C in Power Unit Pančevo

Main Design  elaboration of the Environmental impact Assessment study, and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

NM_051600/UD-RA/13603 of 23.12.2015.

Construction of a small power plant SOS Majdan  2,41 MW and construction of the substation  and connecting cable line

Technical control of the Main Design and supervision

2016

NIS a.d.

NM_051600/UD-RA/12687 of 09.12.2015.

Design of reconstruction and extension of the system for in line blending of motor petrol

Technical inspection of the facility, Unit, devices and equipment and executed civil works.

2015/

2016

NIS a.d.

PRE390000/UD-RA/11151 of 28.10.2015.

Design of condensate collection from the steam line outside the main drive Unit into the closed system in the Power Unit - Pančevo

Main Design and elaboration of the Environmental impact Assessment study providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

GOŠA Montaža

 

Replacement of the relay protection 6 kV in TS R-old unit, installation of a microprocessing protection device

Technical control

2015

NIS a.d.

ENR040000/UD-RA/10580 of 09.10.2015.

Design of walking lanes in Oil Refinery Pančevo

Main Design

2016

NIS a.d.

PRE390000/UD-RA/10057 of 24.09.2015.

Design of construction of a tank for polymer-bitumen

Technical inspection of the facility, Unit, devices and equipment and executed civil works.

2015

NIS a.d.

PRE390000/UD-RA/10003 of 20.09.2015.

Construction of the heavy gasoline storage  (process oil) 100 m3

Elaboration of the Urban Development Plan for the construction of the tanks, Elaboration of the FF protection design Study on the hazardous areas and providing required  approvals for the execution of works

2015

NIS a.d.

GOŠA Montaža

Contract N° NM_041000/IZ-DO/01531 of 14.07.2015

Reconstruction of the FCC Unit – debottlenecking for the operation of the Unit with the capacity  1400 t/day and 1600 t/day in the summer period

Main Design, diagnostics, technical economical analysis and elaboration of the design for construction

2015

NIS a.d.

Contract N°r PRE300000/UD-RA/08188 of 28.07.2015.

Installation of the electric heating on the inlet of GA-2657 and GB-2301 in the Process Unit

Main Design

2015

NIS a.d.

Contract N° PRE390000/UD-RA/08101 of 23.07.2015.

Revamp works on the main lift station on Avenue ''A'' in Refinery Pančevo block 17

Main Design, Technical control of the Main Design, and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

Ugovor PRE390000/UD-RA/07629 od 10.07.2015.

-               ATD of the separator S50, vessels S-17 i S-18 and bundle DC-2601

- El. installations in the Refinery Pančevo laboratory

-               Revamp of the RC pump foundations of the V-tank in the oil blending hall in the Refinery Pančevo

Main Design

2015

Naftagas Technical Services

Contract N° THS700000/UD-RA/00854 of 20.07.2015.

Extension of the Terminal for storage and reloading of oil derivatives

Main Design

2015

Dunav Oil Team d.o.o.

Contract N° 515/2015

Of 06.07.2015.

Revamp works on the complete system of the closed sewage system in Oil Refinery Pančevo

Main Design, Technical control of the Main Design, survey of underground installations by CCTV and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

Contract N° PRE390000/UD-RA/07627 of 10.07.2015.

Installation and connection of the new boiler unit 75 t/h to process lines in the Refinery

Main Design

2015

Oil Refinery Brod

Contract N° 300 - 567/15 of 17.03.2015.

Piping lines, classification, record, control, inspection and testing of pressure equipment

As-Built design of the piping system  (PIOC)

2015

NIS a.d.

PED Inspect

Contract N° 150427-1-P011

06.05.2015.

Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20

Main Design

2015

Oil Refinery Brod

Contract N°146/2015/119K/14 of 20.04.2015.

Installation of  heat exchanger  ''Packinox'' on the Catalytic reforming Unit

Main Design, Plan of preventive measures, Technical control of the design, Environmental impact assessment study and engineering services on providing administrative-technical documentation - approvals for the execution of works

2016

NIS a.d.

Contract N° PRE390000/UD-RA/06841 of 19.06.2015.

Installation of strainers  on the LPG loading station in Oil Refinery Pančevo

Technical control of the Main Design

2015

NIS a.d.

Contract N°. PRE390000/UD-RA/06250 of 08.06.2015.

Installation of mechanical sealers on the pumps  S-2200

Main Design

2015

NIS a.d. Teh.servisi

1934

Petrol station for automotive road vehicles

Technical inspection of the facility

2015

Luka Dunav a.d. Pančevo

Contract N°. 01-167411 of 04.05.2015.

Reconstruction of the boiler unit 75 t/h to process lines in the Refinery

Elaboration of design documentation

2015

Oil Refinery Brod

Contract N° 300 - 567/15 of 17.03.2015.

Reconstruction of piping bundles and heat exchangers in the Ammonia III Unit - Reboiler CO2

Main Design

2015

HIP Azotara

Contract N°. 80402-32-80 of 27.02.2015.

Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20

Elaboration of design documentation

2015

Oil Refinery Brod

Contract N°. 119K/14 of 13.03.2015

Ammonia tank revamp

Main Design

2014

HIP Azotara

Contract N°141001-80 of 09.12.2014.

Replacement of the LV Unit in substations TS- E2, TS-L, TS-F and TS-CCR

Technical control of the Main Design

2014

NIS a.d.

Contract N°ENR100000/UD- RA/11716 of 26.09.2014.

Replacement of the LV Unit distribution line of the substation „TS Uljara 1“

Main Design

2014

NIS a.d.

Contract N°NM_041000/UD- RA/10155 of 25.08.2014.

Piping bundle design  DC-2601 and DC-2602

Main Design

2014

NIS a.d.

Contract °NM_041000/UD- RA/9031 of 25.07.2014.

Installation of frequency regulators and replacement of electrical motors on air coolers S-3600 in Oil Refinery Pančevo

Main Design and Technical control of the Main Design, Supervision and As-Built -Design

2014

NIS a.d.

Contract N°THS700000/UD- RA/01373 of 19.09.2014.

Reconstruction of the Dispatch Building in Oil

Refinery Pančevo

Preliminary and Main design  (mechanical, architectural- civil, water supply and sewage, electrical, fire fighting, automatic fire detection, Power Efficiency Study), technical control of the Main Design and obtaining administrative documentation for the issuance of the Construction Permit

2014

NIS a.d.

Contract N°PRE390000/UD- RA/08864 of 21.07.2014.

Replacement of pumps GA-2901/S, GA-2902/S

i GA-2903/S – turnkey services

Main Design (mechanical, instrumentation, electrical and civil), execution of works on the pumps installation – designs (mechanical, instrumentation, electrical and civil)

2014

NIS a.d.

Contract N°PRE390000/UD- RA/6865 of 28.05.2014.

Fire fighting protection of the Block  6 steel structure - Oil Refinery Pančevo

Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of

Internal

2014

NIS a.d.

Contract N°PRE390000/UD- RA/04109 of 03.04.2014.

Replacement of thermal insulation on the water

steam lines in Oil Refinery Pančevo

Main Design

2014

NIS a.d.

Contract N°PRE390000/UD- RA/04092 of 03.04.2014.

Installation of process analysers  BA-2301 in Oil

Refinery Pančevo

Main Design technological-mechanical

2014

Petroprocess / NIS a.d.

Contract N°2315-1728 of

07.02.14.

Replacement of the electrical motor by an energetically more efficient motor (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil).

2013

Siemens /

NIS a.d.

Contract N°10630/J of 10.10.13.

Adaptation of oil fuel lines for steam boilers - in

Oil Refinery Novi Sad

Main Design (technological-mechanical, instrumentation, electrical).

2013

NIS a.d.

Contract N°PRE300000/UD- RA/16563 of 01.11.2013.

Installation of sound barriers on the Hydrogen

Generation Unit S-5000

Main architectural/civil Design

2013

BMR Group

Contract N°2301 of 16.10.13.

Installation of process analyzers on series

S-500, S-550 and S-570 in Oil Refinery

Pančevo

Main technological-mechanical Design

2013

Petroprocess / NIS a.d.

Contract N°2296  of 26.09.13.

Design of pump and steam turbine replacement by electrical motor on GA-2302 and GA-2305 (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design

2013

Siemens /

NIS a.d.

Contract N°10608/J of 08.10.13.

Design of frequency regulators on the ventilators of the cooling tower

EF-9132 (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2013

NIS a.d.

Contract N°NM_041000/UD- RA/15596 of 09.10.2013.

Design of the revamp works on the supports and reconstruction of the sampling station on the Hydrogen Generation Unit  S-5000

(NIS Oil Refinery Pančevo)

Main Mechanical Design

2013

Heurtey Petrochem

Contract / PO N°2287

Reconstruction of the valve system on the smoke channel  BF-2201 and connection to the

control system (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12524 of 26.07.2013.

Replacement and relocation outside the Ex zone of the 0,4 kV MCC Unit  in Block 5 (Oil Refinery Pančevo)

Conceptual Design with the feasibility study, EIA Study, Main Design (technological-mechanical, instrumentation,

electrical and civil), Technical control of the Main Design,

Supervision and As-Built Design and engineering services

2013

NIS a.d.

Contract N°PRE330000/UD- RA/13006 of 08.08.2013.

Passive fire fighting protection for the skirts of the columns and steel structure of Block 5 (Oil Refinery Pančevo)

Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of

Internal Affairs

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12522 of 26.07.2013.

VRU Unit on the truck loading station of Oil

Refinery Pančevo

Technical control of the Main Design (documentation in foreign language, supplier ''ACKER KVARNER'')

2013

NIS a.d.

Contract N°PRE330000/UD- RA/11703 of 09.07.2013.

 

Revitalization of the Unit for the recuperation of gasses from the flare  S-1000 (Oil Refinery Pančevo)

Technical control / nostrification of the As-Built Design

(technological-mechanical, instrumentation, electrical)

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12054 of 16.07.2013.

Replacement of pumps, installation of frequency regulators and replacement of the electrical

motors on the centrifugal pump

GA-2109

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design

2013

NIS a.d.

Contract N°PRE330000/UD- RA/11697 of 09.07.2013.

Modernization of the installations for bitumen load/offload on the railway and truck loading station, burning out of waste gasses from the storage tanks and installation of the radar gauges and temperature probes  on the tanks (Oil Refinery Pančevo)

Conceptual Design with the feasibility study, EIA Study , Main Design, Technical control of the Main Design and engineering services on providing required approvals and permits

 

 

2013

NIS a.d.

Contract N°PRE330000/UD- RA/10451 of 14.06.2013.

Reconstruction of the batching system S-2600 during the stopped operation of the FCC in Oil Refinery Pančevo

Elaboration of the Main Design (technological-mechanical, instrumentation, electrical, civil, fire protection, EIA Study, Work Protection Study and Study on the protection against natural disasters), Technical Control of the Main Design and engineering services on providing required approvals and permits

2013

NIS a.d.

Contract N°PRE330000/UD- RA/9203

Replacement of the Main fire fighting line, from point ''B'' to Block 9 and from point S7 to the outlet of the FF pumps on the water source with the connection to the piping from the previous 2phases in Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical Control of the Main Design, As Built Design and engineering services on providing required approvals and permits

2013

NIS a.d.

Contract N°NM_041530/UD- RA/5897 of 03.04.2013.

Facility legalization  – Reconstruction of the facility and construction of new facilities for waste water processing in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, elaboration

of the study on environmental impact of the as-built facility

and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P3 of 07.12.2012.

Facility legalization – Construction and reconstruction of PK4 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N˘N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Facility legalization – Construction and reconstruction PS4 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Facility legalization - Reconstruction of the pump station and extension of the control building, Tanks FB-1501, FB-1502, FB-1503, FB-1504 i FB-1505 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Automatic system for the collection of data related to the measurement of vapor

consumption on the Units of

Oil Refinery a.d. Brod

Main Design (technological-mechanical, instrumentation)

2012

Oil Refinery Brod

Contract N°338/2012 of

04.07.2012.

Verification of the characteristics of the batch pumps for the MHC-DNT in Oil Refinery Pančevo

Design of pump characteristics verification

2012

NIS a.d.

Contract N°IV/32-24/22/1-

1009/KAP/N of  14.06.2012.

Capacities for the storage of oil derivatives –

Storage of main drive fuel for special purposes

''Ledinci''

Techno-economical analysis for the development and putting into operation of the storage (elaboration of the schedule and program of required testing, techno- economical analysis and elaboration of technical documentation for the execution of works on the realization of the selected technical solution)

2012

Transnafta a.d.

Contract N°1964/2012 of

07.09.2012.

Modernization and erection of control- measuring devices and automated level

measurement system on the storage tank facility in  Oil Refinery a.d. Brod

 

Main Design (mechanical, electrical and instrumentation with 3D modeling), Technical control of the Main Design

2011/

2012

Rafinerija

a.d. Brod

Contract N°681 of  10.11.2011.

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011/ 2012

CB&I /

NIS a.d.

Contract N°02163-2594

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011

Uralhimmach

Contract N°1448-421/11 of

12.12.2011.

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011/

2012

Heurtey Petrochem s.a.

Contract N°EF09029-2207-00

Terminal for the storage and reloading of oil derivatives - Sremski Karlovci

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2012

Naftachem

Contract N°1/451-11 of

28.09.2011.

Adaptation of the stock follow up system and measuring of the parameters of the storage tanks - Oil Refinery Novi Sad

Technical control of the Main Mechanical Design

2011

NIS a.d.

Contract N°II-32-11-16/25/1-

6124/KAP/N of  31.08.2011

Adaptation of the electronic ignition system on the process furnaces HF-101 and HF-901 in Oil Refinery Novi Sad

Technical control of the Main Design

2011

NIS a.d.

Contract N°II-32-16/25/1-

5951/KAP/N of  22.08.2011

Process pressure equipment

Strength calculations of the heat exchangers and pressure vessels

2011

HIP Azotara

Pančevo

Contract N°254 of  13.01.2011

Adaptation of the facilities within the condensing

Unit of "GPO Energetics" in Oil Refinery

Pančevo

Elaboration of the Main Civil Design, Technical control of the Main Design and construction and finishing works

2010

NIS a.d.

Contract N°05-1/25/1-2403/KAP/N

of  23.12.2010.

Pančevo Oil Refinery Modernization Project

Elaboration of the design-technical documentation on the workshop level

2012

GOŠA Montaža

Contract N°305/10 of  27.10.2010.

Pančevo Oil Refinery Modernization Project –

Construction of the Hydrogen Generation Unit

Main Civil Design

2012

Heurtey Petrochem

Contract N°EF09029-2209

Underground LPG storage tanks.

Main Design

2012

FEROMONT

Contract N°1508 of  10.08.2012.

Reconstruction of the FCC Unit in Oil Refinery

Pančevo

Technical control of the Main Design

2010

NIS a.d.

Contract N°05-1/25/1-1356/KAP/N

of  20.08.2010

Closed drainage system of the flare and gas- meter vessels S-1000 in Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), Supervision services

2010

NIS a.d.

Contract N°05-1/22/1-738/KAP/N

of  07.06.2010.

Reconstruction of the existing dosage system for the neutralization pit FA-2657

Main Design (technological-mechanical, instrumentation, electrical and civil), and equipment supply

2010

NIS a.d.

Contract N°1412/HP of

30.03.2010.

Reconstruction of the existing facility – Washing and lubricating service Unit for tank trucks in the Control-dispatch centre of Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), and acquiring all legal - administrative documents

2010

NIS a.d.

Contract N°II-B-84-580

 

Product pipeline system for petroleum products and terminals in Pančevo,

Novi Sad and Smederevo

 

Preliminary design, Feasibility Study and Envirenmental Impact assesment study

2009

TRANSNAFTA

 

Modernization of existing and construction of new refinery plants in order to achieve current European standards

 

Pre-feasibility study (concept of improvement and modernization of existing plants, concept of new process plants, variants of construction of new plants, investment assessment

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 

Connection of the Diesel Hydrodesulfurization plant from the New production line 3 MM t / y with the Old production line 2 MM t / y

Main Design (technological-mechanical, instrumentation)

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 

Connection of the Sulfur Production Plant from the New Production Line 3 MM t / y with the Old Production Line 2 MM t / y

Main Design (technological-mechanical, instrumentation)

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 


Oil and gas fields, oil terminals (in Libya)

Design of reconstruction and modernization of plants, preparation of as-built documentation

(technical assistance in Libya). As part of the reconstruction and modernization project,0.4 kV distribution, 24V DC and 110V DC distribution voltage distribution plant was also designed.

 

2005/

2008

TEKNICA UK LTD

London

Contract AGO-5-P315

Adaptations of the water cooling system from the desalter with S-100 and S-2100

Main Design (technological-mechanical, instrumentation, electrical and civil)

2008

NIS-RNP

 

Reconstruction of the drainage system in the Bitumen S-0250 plant

Main Design (technological-mechanical, instrumentation, electrical and civil)

2007

NIS-RNP

 

Aroma storage tanks

FB-1101, FB-1103, FB-1106,

FB-3601 and FB-3602 with associated piping installations

Technological-mechanical project of the

 As-Built design

2006

NIS-RNP

 

PIDECO Iran - Package LPG treatment plant

 

Main Design (mechanical, instrumentation, electrical and civil)

2005/

2006

SPG

Nemačka

 

Existing AEG steam turbine

17.6 MW in the Ammonia plant

Specification, procurement, delivery, installation and commissioning of the reconstructed turbine (new rotor of a different model, new stator blades, manufacturer: NEVSKIJ ZAVOD, St. Petersburg

2004

Nitrogen fertilizer factory ASMIDAL, Arzew, Algeria

 

BABCOCK & WILCOX boilers

3 x 50 t / h steam

Main design of replacing the pneumatic automatic control system with

digital system

2003

HIP - AZOTARA

Pančevo

 

Construction of a new TONWEI refinery

capacity 10 million t / y

(11 process plants,

energy and off-site installations)

Feasibility study and General project for the construction of a new Refinery within the conceptual project were elaborated details of the 0.4 kV distribution, as well as the uninterruptible power supply system

2006

Tonwei Investment ,

Port Harcourt , Nigerija

 

Rehabilitation of air conditioning installation

at the KAN plant

Main Design (technological-mechanical, instrumentation, electrical and civil)

2005

HIP - AZOTARA

Pančevo

 

 

2. SUPERVISION SERVICES

 

Facility / Project title

Activities/Project type

Year

Company / Client

Contract No.

Study with proposed activities to increase the operational efficiency of storage and handling of LPG products

Elaboration of the design/technical documentation

In progres

NIS a.d.

NM_051600/UD-RA/009279 28.09.2020.

Harmonization of measuring points for measuring emissions of air pollutants at emitters in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

DWN105000/UD-RA/00650 22.01.2020

Furnace protection in case of gas leakage at plants in Oil Refinery Pančevo

Elaboration of the design/technical documentation

In progres

NIS a.d.

NM_051600/UD-RA/01748 18.02.2020.

Facility for temporary storage of waste in Zrenjanin

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

NFS780000/UD-RA/00280 04.02.2020.

Replacement of 6kV power cables for power supply of TS Estara / TS Enova

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

In progres

NIS a.d.

DWN115000/UD-RA/02773 06.04.2020

Replacement of 0.4 kV plant type T12 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN115000/UD-RA/02773 12.03.2020

Integration of PLC 0.4 kV distribution plants (SWG) in Elektro DCS in RNP

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN115000/UD-RA/09566 13.09.2019

Increasing the diameter of the overflow pipe FA-1000 towards a closed drainage system in the RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-1 03.02.2020.

Dosing of steam neutralizer on S-100 in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-2 03.02.2020.

Reconstruction of pipeline 12 "-P-43-0040-07-01-B01G00A" in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-3 03.02.2020.

Connection of circulation lines of tanks FB-25301 and FB-25304 in RNP

 

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2020

NIS a.d.

DWN111000/UD-RA/01155-4 03.02.2020.

Construction of a storage pool of mud (unit 10) in Novo Miloševo

Elaboration of the design/technical documentation

2019

NIS a.d.

NFS900000/UD-RA/06054 31.05.2019

Terminal for the storage of oil derivatives - Sremski Karlovci

Development of an environmental impact assessment Study

2019

Eling Plan d.o.o.

2554 of 23.10.2018.

Substations  : Jermenovci (10/0,4 kV, 160 kVA), Janošik (10/0,4 kV, 60 kVA), Sirakovo (400 kVA), Kikinda (400 kVA), Kikinda (630 kVA), Kikinda (160 kVA), Mokrin (sever 50 kVA) (west 50 kVA), Turija (250 kVA), Turija (400 kVA),

Elaboration of the simplified mining design for the reconstruction

2019

NIS a.d.

UPS300000/UD-RA/13893 of 15.11.2018.

ASTUP unit SLP in Oil Refinery Brod, Bosnia and Herzegovina

Elaboration of the design for the modernization

2019

SCAN Projkt d.o.o. Zagreb, HR

35/18 of 24.09.2018.

Replacement of the burners on process heaters   BA-2101 and BA-2301

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

Turbomehanika / NIS a.d.

P2599 of 30.08.2018.

Expertise of the causes for the collapse of the canopy on SSG Novi Sad

Elaboration of the expertise

2018

NIS a.d.

PR0650000/UD-RA/09928

Of 17.08.2018.

Reconstruction and construction of the oil derivatives storages  SND Novi Sad, SND Niš and SND Smederevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2019

NIS a.d.

NM_041000/UD-RA/12769 of 22.10.2018.

Oil field Velebit - Kanjiža

Elaboration of the design/technical and preparation of the Study on the performed measurements by the LRUT method

2018

NIS a.d.

UPS300000/UD-RA/08144

Of 03.07.2018.

Oil Refinery - Šid

Elaboration of control calculations of process equipment

2018

Victorija Oil

4500038723

Design of the tanks drainage system

Elaboration of the design / technical documentation for the drainage of  45 tanks into the existing system of oily process waters

2018

Oil Refinery Brod

181K/18

Of 30.05.2018.

Construction of the basin for the storage of drilling muds  (8 and 9 cartidges) in Novo Miloševo

Elaboration of the Detail Design

2018

NIS a.d.

OFS280000/UD-RA/06614

Of 28.05.2018.

Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

NIS a.d.

9500086831

Of 25.04.2018.

Reconstruction of the drive unit of the compressor GB-2601 in Oil Refinery Pančevo

Elaboration of the design/technical documentation and obtaining all the required permits and approvals

2018

SIEMENS /

NIS a.d.

9500086831

Of 25.04.2018.

Installation of the louvres on the channels after the FAN ½ for air regulation on the superheaters to the heater BA-2101

Elaboration of the design/technical documentation

2018

NIS a.d.

NM_051600/UD-RA/07417

of 13.06.2018.

Installation of the ventilators on the cooling tower

Elaboration of the design/technical documentation

2018

NIS a.d.

UPS300000/UD-RA/5538

Of 03.05.2018.

Repair of the storage supports in PITING Unit in Elemir

Elaboration of the design/technical documentation

2018

NIS a.d.

UPS300000/UD-RA/5538

Of 03.05.2018.

Development  of refinery processing in Oil Refinery Pančevo – Construction of new units

Technical review of the plant, devices,  equipment and executed works

2018

NIS a.d.

NM_080000/UD-RA/05818

Of 09.05.2018.

Repair of the piping between the lower MGO and upper MGO zone of the petrol storage Ledinci

Elaboration of the technical-economical analysis and design/technical documentation

2018

Transnafta a.d.

1980/1-2018

of 02.03.2018.

Design for site arrangment for the accomodation of the contractors

Elaboration of the detail design

2018

NIS a.d.

PRE390000/UD-RA/01476 of 31.1.2018.

Design for the replacement of the low-alloy piping S-2200

Elaboration of the detail design and checking of the technical documentation by the Notified Body

2018

NIS a.d.

PRE390000/UD-RA/15047 of 21.12.2018.

Adaptation of the laboratory on NGP Velebit

Elaboration of the simplified mining design

2018

NIS a.d.

UPS300000/UD-RA/03304

Of 14.03.2018.

Installation of the blind valves on the storage tanks in manipulation

Elaboration of the Detail Design

2017

NIS a.d.

PRE 390000/UD-RA/12373 OF 25.10.2017

Detail design based on the assessment of the condition of the equipment, concrete and steel structures, oil sewage and piping on S-2550 LPG Merox

Elaboration of the Detail Design

2018

CB&I/NIS a.d.

172784-SC-EN-001.01 of 30.10.2017.

Feasibility Study for the reconstruction of the laboratory building with variant conceptual solution for the reconstruction of the unit for NIS Rafinery Pančevo

Elaboration of the Feasibility Stydy and Conceptual Solution

2018

NIS a.d.

NM_051600/UD-RA/14215 of 04.12.2017.

Replacement  of 6 kV supply cable for Substation TS N2

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

NM_041000/IZ-DO/011914 of 16.08.2017.

Adaptation of the pigging point on the oil pipeline Elemir – Novi Sad

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

UPS330000/UD-RA/08169 of 12.07.2017.

Design of reservoir for H2SO4 storage in Power unit Pančevo

Elaboration of Preliminary Design and Design for Construction, Environmental impact assessment study and providing all required administrative documentation

2017

NIS a.d.

NM_041000/IZ-DO/08483 of 05.06.2017.

Refurbishment of fire protection coating on steel construction at VRU at oil station and supporting columns of reservoirs

Elaboration of design documentation

2017

NIS a.d.

PRE390000/UD-RA/04637 of 18.04.2017.

Design of electrical installation of drilling rigs

Elaboration of design documentation (electro-energetic installations, installation of measurement and regulation, and Explosion Protection Document )

2017

Naftagas – Oilfield Services

NFS720000/UD-RA/00309 of 20.04.2017.

Rehabilitation of interconnection between secondary reformer 103-D and boiler 101-C at NH3 plant III

Elaboration of design for construction

2017

HIP Azotara  -Ammonia Plant Pančevo

2484

Construction of a canopy  for oils and lubricants and construction of a canopy for spare part

Elaboration of Preliminar design, Design for Construction permit, Design for Construction, Main Design for Fire protection, and providing all required administrative documentation

2017

Naftagas – Technical Services

NM_051600/UD-RA/02065 of 20.02.2017.

Reconstruction of substations:

-       STS Banatski dvor

-       STS Je-101 Jermenovci

-       LTS Lokve

-       STS SS-3 Kv 20/0,4 kV 160 kVA – S.Banat

-       STS KS-1 Mk Zapad 160 kVA – S.Banat

-       STS KS-2 Mk Zapad 250 kVA – S.Banat

-       STS KS-3 Mk Zapad 100 kVA – S.Banat

MBTS SOS Mk Jug 2 x 630 kVA -  S.Banat

Elaboration of design – technical documentation for the reconstruction of substations

2016

NIS a.d.

NM_041000/IZ-DO/017540 of 03.11.2016.

Construction of the weak nitric acid separator – condenser 3.1E-3.11

Elaboration of the Design for Construction (PZI)

2016

HIP Azotara

 

Design of adaptation of  line IV

of the LDPE plant

Elaboration of the design – technical documentation and obtaining the all required permits and approvals (Feasibility study, Preliminary Design, Environmental impact assessment study, plan of preventive measures, Main Design of Fire protection systam, Design for Construction Permit, As-Built Design, providing all required administrative and authority documentation and approvals)

2016/

2017

HIP Petrohemija

1525/16 of 30.09.2016.

Development of refinery treatment

Assesment of the equipment conditions, concrete and steel structures, oily sewage and pipelines on the plant S-2550 LPG MEROX

2016

NIS a.d.

PRE300000/UD-RA/09616 of 25.08.2016.

Second phase of revitalization (membranisation) of the part on the boiler furnace  OP-380b

Elaboration of Preliminary Design , Project for Construction and As-Build Design

2016

Power Plant Morava Svilajnac/

RAFAKO

121/2016 of 08.09.2016.

Design of the exploitation of alkylates heat from the bottom of the column DA-2601

Design for construction permit, Design for construction, As built design

2016

NIS a.d.

NM_051600/UD-RA/6685  23.06.2016.

Design of the superheater, connected piping of the intermediate heaters  MP1-MP2 and ejection piping on block B2 – TENT B

Elaboration of the conceptual design, design for construction and as-built design

2016

Power Plant Nikola Tesla/

RAFAKO

2214 – 1

12.05.2016.

Adaptation of the instrument air system in the Power Unit  Pancevo

Elaboration of the conceptual solution, Conceptual design, Design for construction permit, Design for construction, As built design, Environmental impact assessment study, providing all required administrative documentation, Equipment procurement and installation of the equipment with the providing of the operation permit.

2016

NIS a.d.

NM_041000/IZ-DO/006810 of 20.04.2016.

Adaptation of the drainage system on S-0250

Construction of the closed drainage system in Oil Refinery Pancevo

Elaboration of the Design for construction and

of the As-built design

2016

NIS a.d.

MERA Zrenjanin

PRE400000/UD-RA/04139 of 18.04.2016.

Construction of a wind power plant

Elaboration of the impact study of the wind turbines in the protection zone of the product pipelines, technical control of the design.

2016

Wind Vision Vindfarm d.o.o.

19-2-1-2016 of

01.02.2016.

Adaptation of the natural gas heating system S-9900 i S-9950 and regulation of the natural gas flow on S-9900

Main Design, elaboration of the Environmental impact Assessment study and providing required administrative-technical documentation - approvals for the execution of works

2016

NIS a.d.

NM_041000/IZ-DO/000030 of 04.01.2016.

Installation of the cooling and ventilation system for the main process substations TS N1, TS N2 i TS C in Power Unit Pančevo

Main Design  elaboration of the Environmental impact Assessment study, and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

NM_051600/UD-RA/13603 of 23.12.2015.

Construction of a small power plant SOS Majdan  2,41 MW and construction of the substation  and connecting cable line

Technical control of the Main Design and supervision

2016

NIS a.d.

NM_051600/UD-RA/12687 of 09.12.2015.

Design of reconstruction and extension of the system for in line blending of motor petrol

Technical inspection of the facility, Unit, devices and equipment and executed civil works.

2015/

2016

NIS a.d.

PRE390000/UD-RA/11151 of 28.10.2015.

Design of condensate collection from the steam line outside the main drive Unit into the closed system in the Power Unit - Pančevo

Main Design and elaboration of the Environmental impact Assessment study providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

GOŠA Montaža

 

Replacement of the relay protection 6 kV in TS R-old unit, installation of a microprocessing protection device

Technical control

2015

NIS a.d.

ENR040000/UD-RA/10580 of 09.10.2015.

Design of walking lanes in Oil Refinery Pančevo

Main Design

2016

NIS a.d.

PRE390000/UD-RA/10057 of 24.09.2015.

Design of construction of a tank for polymer-bitumen

Technical inspection of the facility, Unit, devices and equipment and executed civil works.

2015

NIS a.d.

PRE390000/UD-RA/10003 of 20.09.2015.

Construction of the heavy gasoline storage  (process oil) 100 m3

Elaboration of the Urban Development Plan for the construction of the tanks, Elaboration of the FF protection design Study on the hazardous areas and providing required  approvals for the execution of works

2015

NIS a.d.

GOŠA Montaža

Contract N° NM_041000/IZ-DO/01531 of 14.07.2015

Reconstruction of the FCC Unit – debottlenecking for the operation of the Unit with the capacity  1400 t/day and 1600 t/day in the summer period

Main Design, diagnostics, technical economical analysis and elaboration of the design for construction

2015

NIS a.d.

Contract N°r PRE300000/UD-RA/08188 of 28.07.2015.

Installation of the electric heating on the inlet of GA-2657 and GB-2301 in the Process Unit

Main Design

2015

NIS a.d.

Contract N° PRE390000/UD-RA/08101 of 23.07.2015.

Revamp works on the main lift station on Avenue ''A'' in Refinery Pančevo block 17

Main Design, Technical control of the Main Design, and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

Ugovor PRE390000/UD-RA/07629 od 10.07.2015.

-               ATD of the separator S50, vessels S-17 i S-18 and bundle DC-2601

- El. installations in the Refinery Pančevo laboratory

-               Revamp of the RC pump foundations of the V-tank in the oil blending hall in the Refinery Pančevo

Main Design

2015

Naftagas Technical Services

Contract N° THS700000/UD-RA/00854 of 20.07.2015.

Extension of the Terminal for storage and reloading of oil derivatives

Main Design

2015

Dunav Oil Team d.o.o.

Contract N° 515/2015

Of 06.07.2015.

Revamp works on the complete system of the closed sewage system in Oil Refinery Pančevo

Main Design, Technical control of the Main Design, survey of underground installations by CCTV and providing required administrative-technical documentation - approvals for the execution of works

2015

NIS a.d.

Contract N° PRE390000/UD-RA/07627 of 10.07.2015.

Installation and connection of the new boiler unit 75 t/h to process lines in the Refinery

Main Design

2015

Oil Refinery Brod

Contract N° 300 - 567/15 of 17.03.2015.

Piping lines, classification, record, control, inspection and testing of pressure equipment

As-Built design of the piping system  (PIOC)

2015

NIS a.d.

PED Inspect

Contract N° 150427-1-P011

06.05.2015.

Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20

Main Design

2015

Oil Refinery Brod

Contract N°146/2015/119K/14 of 20.04.2015.

Installation of  heat exchanger  ''Packinox'' on the Catalytic reforming Unit

Main Design, Plan of preventive measures, Technical control of the design, Environmental impact assessment study and engineering services on providing administrative-technical documentation - approvals for the execution of works

2016

NIS a.d.

Contract N° PRE390000/UD-RA/06841 of 19.06.2015.

Installation of strainers  on the LPG loading station in Oil Refinery Pančevo

Technical control of the Main Design

2015

NIS a.d.

Contract N°. PRE390000/UD-RA/06250 of 08.06.2015.

Installation of mechanical sealers on the pumps  S-2200

Main Design

2015

NIS a.d. Teh.servisi

1934

Petrol station for automotive road vehicles

Technical inspection of the facility

2015

Luka Dunav a.d. Pančevo

Contract N°. 01-167411 of 04.05.2015.

Reconstruction of the boiler unit 75 t/h to process lines in the Refinery

Elaboration of design documentation

2015

Oil Refinery Brod

Contract N° 300 - 567/15 of 17.03.2015.

Reconstruction of piping bundles and heat exchangers in the Ammonia III Unit - Reboiler CO2

Main Design

2015

HIP Azotara

Contract N°. 80402-32-80 of 27.02.2015.

Replacement and modernization of the 0,4 kV equipment (except for section 31) in substation P-20

Elaboration of design documentation

2015

Oil Refinery Brod

Contract N°. 119K/14 of 13.03.2015

Ammonia tank revamp

Main Design

2014

HIP Azotara

Contract N°141001-80 of 09.12.2014.

Replacement of the LV Unit in substations TS- E2, TS-L, TS-F and TS-CCR

Technical control of the Main Design

2014

NIS a.d.

Contract N°ENR100000/UD- RA/11716 of 26.09.2014.

Replacement of the LV Unit distribution line of the substation „TS Uljara 1“

Main Design

2014

NIS a.d.

Contract N°NM_041000/UD- RA/10155 of 25.08.2014.

Piping bundle design  DC-2601 and DC-2602

Main Design

2014

NIS a.d.

Contract °NM_041000/UD- RA/9031 of 25.07.2014.

Installation of frequency regulators and replacement of electrical motors on air coolers S-3600 in Oil Refinery Pančevo

Main Design and Technical control of the Main Design, Supervision and As-Built -Design

2014

NIS a.d.

Contract N°THS700000/UD- RA/01373 of 19.09.2014.

Reconstruction of the Dispatch Building in Oil

Refinery Pančevo

Preliminary and Main design  (mechanical, architectural- civil, water supply and sewage, electrical, fire fighting, automatic fire detection, Power Efficiency Study), technical control of the Main Design and obtaining administrative documentation for the issuance of the Construction Permit

2014

NIS a.d.

Contract N°PRE390000/UD- RA/08864 of 21.07.2014.

Replacement of pumps GA-2901/S, GA-2902/S

i GA-2903/S – turnkey services

Main Design (mechanical, instrumentation, electrical and civil), execution of works on the pumps installation – designs (mechanical, instrumentation, electrical and civil)

2014

NIS a.d.

Contract N°PRE390000/UD- RA/6865 of 28.05.2014.

Fire fighting protection of the Block  6 steel structure - Oil Refinery Pančevo

Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of

Internal

2014

NIS a.d.

Contract N°PRE390000/UD- RA/04109 of 03.04.2014.

Replacement of thermal insulation on the water

steam lines in Oil Refinery Pančevo

Main Design

2014

NIS a.d.

Contract N°PRE390000/UD- RA/04092 of 03.04.2014.

Installation of process analysers  BA-2301 in Oil

Refinery Pančevo

Main Design technological-mechanical

2014

Petroprocess / NIS a.d.

Contract N°2315-1728 of

07.02.14.

Replacement of the electrical motor by an energetically more efficient motor (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil).

2013

Siemens /

NIS a.d.

Contract N°10630/J of 10.10.13.

Adaptation of oil fuel lines for steam boilers - in

Oil Refinery Novi Sad

Main Design (technological-mechanical, instrumentation, electrical).

2013

NIS a.d.

Contract N°PRE300000/UD- RA/16563 of 01.11.2013.

Installation of sound barriers on the Hydrogen

Generation Unit S-5000

Main architectural/civil Design

2013

BMR Group

Contract N°2301 of 16.10.13.

Installation of process analyzers on series

S-500, S-550 and S-570 in Oil Refinery

Pančevo

Main technological-mechanical Design

2013

Petroprocess / NIS a.d.

Contract N°2296  of 26.09.13.

Design of pump and steam turbine replacement by electrical motor on GA-2302 and GA-2305 (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design

2013

Siemens /

NIS a.d.

Contract N°10608/J of 08.10.13.

Design of frequency regulators on the ventilators of the cooling tower

EF-9132 (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2013

NIS a.d.

Contract N°NM_041000/UD- RA/15596 of 09.10.2013.

Design of the revamp works on the supports and reconstruction of the sampling station on the Hydrogen Generation Unit  S-5000

(NIS Oil Refinery Pančevo)

Main Mechanical Design

2013

Heurtey Petrochem

Contract / PO N°2287

Reconstruction of the valve system on the smoke channel  BF-2201 and connection to the

control system (Oil Refinery Pančevo)

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12524 of 26.07.2013.

Replacement and relocation outside the Ex zone of the 0,4 kV MCC Unit  in Block 5 (Oil Refinery Pančevo)

Conceptual Design with the feasibility study, EIA Study, Main Design (technological-mechanical, instrumentation,

electrical and civil), Technical control of the Main Design,

Supervision and As-Built Design and engineering services

2013

NIS a.d.

Contract N°PRE330000/UD- RA/13006 of 08.08.2013.

Passive fire fighting protection for the skirts of the columns and steel structure of Block 5 (Oil Refinery Pančevo)

Main Design (fire protection design, technological- mechanical and civil), Technical control of the Main Design, providing approval for the Main Design from the Ministry of

Internal Affairs

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12522 of 26.07.2013.

VRU Unit on the truck loading station of Oil

Refinery Pančevo

Technical control of the Main Design (documentation in foreign language, supplier ''ACKER KVARNER'')

2013

NIS a.d.

Contract N°PRE330000/UD- RA/11703 of 09.07.2013.

 

Revitalization of the Unit for the recuperation of gasses from the flare  S-1000 (Oil Refinery Pančevo)

Technical control / nostrification of the As-Built Design

(technological-mechanical, instrumentation, electrical)

2013

NIS a.d.

Contract N°PRE330000/UD- RA/12054 of 16.07.2013.

Replacement of pumps, installation of frequency regulators and replacement of the electrical

motors on the centrifugal pump

GA-2109

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design, Supervision and As-Built Design

2013

NIS a.d.

Contract N°PRE330000/UD- RA/11697 of 09.07.2013.

Modernization of the installations for bitumen load/offload on the railway and truck loading station, burning out of waste gasses from the storage tanks and installation of the radar gauges and temperature probes  on the tanks (Oil Refinery Pančevo)

Conceptual Design with the feasibility study, EIA Study , Main Design, Technical control of the Main Design and engineering services on providing required approvals and permits

 

 

2013

NIS a.d.

Contract N°PRE330000/UD- RA/10451 of 14.06.2013.

Reconstruction of the batching system S-2600 during the stopped operation of the FCC in Oil Refinery Pančevo

Elaboration of the Main Design (technological-mechanical, instrumentation, electrical, civil, fire protection, EIA Study, Work Protection Study and Study on the protection against natural disasters), Technical Control of the Main Design and engineering services on providing required approvals and permits

2013

NIS a.d.

Contract N°PRE330000/UD- RA/9203

Replacement of the Main fire fighting line, from point ''B'' to Block 9 and from point S7 to the outlet of the FF pumps on the water source with the connection to the piping from the previous 2phases in Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical Control of the Main Design, As Built Design and engineering services on providing required approvals and permits

2013

NIS a.d.

Contract N°NM_041530/UD- RA/5897 of 03.04.2013.

Facility legalization  – Reconstruction of the facility and construction of new facilities for waste water processing in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, elaboration

of the study on environmental impact of the as-built facility

and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P3 of 07.12.2012.

Facility legalization – Construction and reconstruction of PK4 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N˘N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Facility legalization – Construction and reconstruction PS4 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design, and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Facility legalization - Reconstruction of the pump station and extension of the control building, Tanks FB-1501, FB-1502, FB-1503, FB-1504 i FB-1505 in Oil Refinery Pančevo

Geodetic surveys and elaboration of geodetic documentation, Elaboration of As-Built Design and engineering services on providing required approvals and permits

2012/

2013

NIS a.d.

Contract N°N/32-26/22/1-

435/KAP/N/P5 of 07.12.2012.

Automatic system for the collection of data related to the measurement of vapor

consumption on the Units of

Oil Refinery a.d. Brod

Main Design (technological-mechanical, instrumentation)

2012

Oil Refinery Brod

Contract N°338/2012 of

04.07.2012.

Verification of the characteristics of the batch pumps for the MHC-DNT in Oil Refinery Pančevo

Design of pump characteristics verification

2012

NIS a.d.

Contract N°IV/32-24/22/1-

1009/KAP/N of  14.06.2012.

Capacities for the storage of oil derivatives –

Storage of main drive fuel for special purposes

''Ledinci''

Techno-economical analysis for the development and putting into operation of the storage (elaboration of the schedule and program of required testing, techno- economical analysis and elaboration of technical documentation for the execution of works on the realization of the selected technical solution)

2012

Transnafta a.d.

Contract N°1964/2012 of

07.09.2012.

Modernization and erection of control- measuring devices and automated level

measurement system on the storage tank facility in  Oil Refinery a.d. Brod

 

Main Design (mechanical, electrical and instrumentation with 3D modeling), Technical control of the Main Design

2011/

2012

Rafinerija

a.d. Brod

Contract N°681 of  10.11.2011.

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011/ 2012

CB&I /

NIS a.d.

Contract N°02163-2594

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011

Uralhimmach

Contract N°1448-421/11 of

12.12.2011.

Pančevo Oil Refinery Modernization Project

Elaboration of control strength calculation and nostrification of pressure vessels

2011/

2012

Heurtey Petrochem s.a.

Contract N°EF09029-2207-00

Terminal for the storage and reloading of oil derivatives - Sremski Karlovci

Main Design (technological-mechanical, instrumentation, electrical and civil), Technical control of the Main Design

2012

Naftachem

Contract N°1/451-11 of

28.09.2011.

Adaptation of the stock follow up system and measuring of the parameters of the storage tanks - Oil Refinery Novi Sad

Technical control of the Main Mechanical Design

2011

NIS a.d.

Contract N°II-32-11-16/25/1-

6124/KAP/N of  31.08.2011

Adaptation of the electronic ignition system on the process furnaces HF-101 and HF-901 in Oil Refinery Novi Sad

Technical control of the Main Design

2011

NIS a.d.

Contract N°II-32-16/25/1-

5951/KAP/N of  22.08.2011

Process pressure equipment

Strength calculations of the heat exchangers and pressure vessels

2011

HIP Azotara

Pančevo

Contract N°254 of  13.01.2011

Adaptation of the facilities within the condensing

Unit of "GPO Energetics" in Oil Refinery

Pančevo

Elaboration of the Main Civil Design, Technical control of the Main Design and construction and finishing works

2010

NIS a.d.

Contract N°05-1/25/1-2403/KAP/N

of  23.12.2010.

Pančevo Oil Refinery Modernization Project

Elaboration of the design-technical documentation on the workshop level

2012

GOŠA Montaža

Contract N°305/10 of  27.10.2010.

Pančevo Oil Refinery Modernization Project –

Construction of the Hydrogen Generation Unit

Main Civil Design

2012

Heurtey Petrochem

Contract N°EF09029-2209

Underground LPG storage tanks.

Main Design

2012

FEROMONT

Contract N°1508 of  10.08.2012.

Reconstruction of the FCC Unit in Oil Refinery

Pančevo

Technical control of the Main Design

2010

NIS a.d.

Contract N°05-1/25/1-1356/KAP/N

of  20.08.2010

Closed drainage system of the flare and gas- meter vessels S-1000 in Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), Supervision services

2010

NIS a.d.

Contract N°05-1/22/1-738/KAP/N

of  07.06.2010.

Reconstruction of the existing dosage system for the neutralization pit FA-2657

Main Design (technological-mechanical, instrumentation, electrical and civil), and equipment supply

2010

NIS a.d.

Contract N°1412/HP of

30.03.2010.

Reconstruction of the existing facility – Washing and lubricating service Unit for tank trucks in the Control-dispatch centre of Oil Refinery Pančevo

Main Design (technological-mechanical, instrumentation, electrical and civil), and acquiring all legal - administrative documents

2010

NIS a.d.

Contract N°II-B-84-580

 

Product pipeline system for petroleum products and terminals in Pančevo,

Novi Sad and Smederevo

 

Preliminary design, Feasibility Study and Envirenmental Impact assesment study

2009

TRANSNAFTA

 

Modernization of existing and construction of new refinery plants in order to achieve current European standards

 

Pre-feasibility study (concept of improvement and modernization of existing plants, concept of new process plants, variants of construction of new plants, investment assessment

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 

Connection of the Diesel Hydrodesulfurization plant from the New production line 3 MM t / y with the Old production line 2 MM t / y

Main Design (technological-mechanical, instrumentation)

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 

Connection of the Sulfur Production Plant from the New Production Line 3 MM t / y with the Old Production Line 2 MM t / y

Main Design (technological-mechanical, instrumentation)

2009

ZARUBEZNJEFT Bosanski Brod Olil Refinery

 


Oil and gas fields, oil terminals (in Libya)

Design of reconstruction and modernization of plants, preparation of as-built documentation

(technical assistance in Libya). As part of the reconstruction and modernization project,0.4 kV distribution, 24V DC and 110V DC distribution voltage distribution plant was also designed.

 

2005/

2008

TEKNICA UK LTD

London

Contract AGO-5-P315

Adaptations of the water cooling system from the desalter with S-100 and S-2100

Main Design (technological-mechanical, instrumentation, electrical and civil)

2008

NIS-RNP

 

Reconstruction of the drainage system in the Bitumen S-0250 plant

Main Design (technological-mechanical, instrumentation, electrical and civil)

2007

NIS-RNP

 

Aroma storage tanks

FB-1101, FB-1103, FB-1106,

FB-3601 and FB-3602 with associated piping installations

Technological-mechanical project of the

 As-Built design

2006

NIS-RNP

 

PIDECO Iran - Package LPG treatment plant

 

Main Design (mechanical, instrumentation, electrical and civil)

2005/

2006

SPG

Nemačka

 

Existing AEG steam turbine

17.6 MW in the Ammonia plant

Specification, procurement, delivery, installation and commissioning of the reconstructed turbine (new rotor of a different model, new stator blades, manufacturer: NEVSKIJ ZAVOD, St. Petersburg

2004

Nitrogen fertilizer factory ASMIDAL, Arzew, Algeria

 

BABCOCK & WILCOX boilers

3 x 50 t / h steam

Main design of replacing the pneumatic automatic control system with

digital system

2003

HIP - AZOTARA

Pančevo

 

Construction of a new TONWEI refinery

capacity 10 million t / y

(11 process plants,

energy and off-site installations)

Feasibility study and General project for the construction of a new Refinery within the conceptual project were elaborated details of the 0.4 kV distribution, as well as the uninterruptible power supply system

2006

Tonwei Investment ,

Port Harcourt , Nigerija

 

Rehabilitation of air conditioning installation

at the KAN plant

Main Design (technological-mechanical, instrumentation, electrical and civil)

2005

HIP - AZOTARA

Pančevo

 

 

3. TECHNICAL INSPECTION OF FACILITIES

 

Facility / Project title

Activities/Project type

Year

Company / Client

Contract No.

Development of refinery processing in Oil Refinery Pančevo – NIS Gaspromnjeft (Delayed coking unit - DCU with auxiliary facilities and interconnecting units)

The Commission for technical inspection and verification of performed works and installed plants

In progress

NIS a.d.

Gastrans d.o.o.

NM_080000/UD-RA/05818

09.05.2018.

Construction of three spherical tanks for storage of LPG (propylene, C4 mix) S-16800 in the Pančevo Oil Refinery

The Commission for technical inspection and verification of performed works and installed plants

2020.

NIS a.d. Refining

NM_080000/UD-RA/05818

09.05.2018.

Reconstruction of the plant - LPG Merox III S-2550 in the Pančevo Oil Refinery

The Commission for technical inspection and verification of performed works and installed plants

In progress

NIS a.d. Refining

NM_080000/UD-RA/05818

09.05.2018.

Reconstruction of MHC / DHT S-4300 plant in Pancevo Oil Refinery

The Commission for technical inspection and verification of performed works and installed plants

In progress

NIS a.d. Refining

NM_080000/UD-RA/05818

09.05.2018.

Reconstruction of the plant - SRU II S-4450 in the Pancevo Oil Refinery

The Commission for technical inspection and verification of performed works and installed plants

In progress

NIS a.d. Refining

NM_080000/UD-RA/05818

09.05.2018.

Reconstruction of existing facilities in manipulation and installation of new equipment in order to adjust the system for the deep processing plant in the Pancevo Oil Refinery

The Commission for technical inspection and verification of performed works and installed plants

In progress

NIS a.d. Refining

NM_080000/UD-RA/05818

09.05.2018.

Reconstruction of the FB-1109 tank in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Reconstruction of the FB-0805 tank in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Harmonization of the jet fuel system with the requirements of the JIG 153, Block 13, 16, 20 and 24 standards in the Pančevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Reconstruction of the FB-0807 tank in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Reconstruction of the FB-2003 tank in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Reconstruction of the railway filling station by installing loading arms for lower filling of aromas in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

Reconstruction of the FB-0711 and FB-0714 tanks in the Pancevo Oil Refinery

Technical inspection of the facility and executed works and first control of installations in explosion danger zones

In progress

NIS a.d. Refining

DWN105000/UD-RA/11752/2020

03.12.2020.

New energy corridor in the wider zone of the state road IA (Highway E-75), namely: Gas pipelines RG 04-11 and RG 04-11 / II; Oil pipelines DN1 and DN2; NNS and ENS oil pipelines

Technical inspection of the facility

In progress

Srbijagas

18-11250 of 01.11.2018.

In-line blending of motor gasolines

Technical inspection of the facility, Unit, devices and equipment and executed works.

2016

NIS a.d. Refining

PRE390000/UD-RA/11151

28.10.2015.

The construction of a tank for polymer-bitumen

Technical inspection of the facility, Unit, devices and equipment and executed works.

2016

NIS a.d. Refining

PRE390000/UD-RA/10003  20.09.2015.

Petrol station for automotive road vehicles

Technical inspection of the facility

2015

Luka Dunav a.d. Pančevo

01-167411 of 04.05.2015.

 

                                                                                                                                                                                                    

 